Forum quick links
Airport projects now have space type options available in LEED Online
posted by Ricardo Sá on
Dear All,
HVAC only project
posted by Krysta Aten-Schell on
Looking for guidance on HVAC-only scope project. We are preparing a proposal for an exsiting DoD facility on an Army Base. The RFP requires minimum LEED Silver Certification (formal cer
LEED Indoor water use calculator
NC-v4 WEc2:Indoor water use reductionposted by Jason Garvens on
If a project is using reclaimed greywayter and rainwater stored in a cistern to flush toilets in a building how would one properly account for that on the LEED Indoor water use reduction calculator
Formaldehyde levels too high in ONE room
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jenni Betancourt on
For a current higher education project, they performed the Air Testing and it shows everything in compliance except for one room showed a level out of compliance for Formaldehyde.
Space with sDA compliant and ASE not compliant does not count for sDA?
NC-v4 EQc7:Daylightposted by Ricardo Sá on
HI,
Home page design
posted by Andrea Lemon on
I am now embarking on the home page design, but before I get started I need input on what you'd like to have there.
OPTION 1. METERING - tenant level meters
CI-v4 EAc3:Advanced energy meteringposted by Matt Edwards on
Our tenant space consists of 1 full floor and part of another floor in a high rise office building. We would like to know whether the design as described below would meet