Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

HVAC only project

LEED Rating System Selection
posted by  Krysta Aten-Schell  on 

Looking for guidance on HVAC-only scope project.  We are preparing a proposal for an exsiting DoD facility on an Army Base.  The RFP requires minimum LEED Silver Certification (formal cer

3
Wed Aug 29, 2018, 1:35 pm

LEED Indoor water use calculator

NC-v4 WEc2:Indoor water use reduction
posted by  Jason Garvens  on 

If a project is using reclaimed greywayter and rainwater stored in a cistern to flush toilets in a building how would one properly account for that on the LEED Indoor water use reduction calculator

3
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Aug 29, 2018, 1:29 pm

Formaldehyde levels too high in ONE room

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Jenni Betancourt  on 

For a current higher education project, they performed the Air Testing and it shows everything in compliance except for one room showed a level out of compliance for Formaldehyde.

2
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Aug 29, 2018, 3:18 am
6
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Aug 28, 2018, 11:52 pm
4
Tue Aug 28, 2018, 10:32 pm

Home page design

BITuser
posted by  Andrea Lemon  on 

I am now embarking on the home page design, but before I get started I need input on what you'd like to have there.

9
Design Director
BuildingGreen, Inc.
LEEDuser Premium Member
0 thumbs up
Tue Aug 28, 2018, 6:51 pm

OPTION 1. METERING - tenant level meters

CI-v4 EAc3:Advanced energy metering
posted by  Matt Edwards  on 

Our tenant space consists of 1 full floor and part of another floor in a high rise office building.  We would like to know whether the design as described below would meet

1
Fri Sep 7, 2018, 2:31 pm