Forum quick links
No issues
Pilot-Credits EApc111:Alternative Performance Rating Methodposted by Maureen Mahle on
I haven't found any major issue for this credit using this PC.
Design Credits vs Construction Credits
posted by Erin Holdenried on
Is there document that lists which credits are "design" credits and which are "construction" credits, for any of the rating systems?
Schools criteria
NC-v4 EQc9:Acoustic performanceposted by Norma Lehman on
Is an academic building on a University campus required to meet the "schools" criteria or is that referencing K-12 only?
Lighting Power Allowance in Landmarked Building
CI-v4 EAp2:Minimum energy performanceposted by Nita Christopher on
We are attempting to certify a small tenant fit out (7,000sf) in a recently awarded LEED v4 EBOM Gold building with Landmark status.
ISO requirements for EPDs
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Craig Graber on
Hi, this is Rebecca from Atelier Ten.
LEED boundary - urban infill project - LEED V4 C&S
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Gibbons on
Hi folks,
why only a plan and not a final report after M&V?
NC-2009 EAc5:Measurement and Verificationposted by ANNE JURAN on
To earn this credit all we submit is the plan which basically says we're going to recalibrate and we'll deal with any problems later, right? Is there any backcheck from GBCI on this?
USGBC rainfall events calculator
NC-v4 SSc4:Rainwater managementposted by Leanne Niu on
We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site?&
Carpet Tile as an Entryway System
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by James Keohane on
The Reference Guide for EQc1, Option 1- Entryway Systems describes entryway system in part ..…...