Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Daylight - Option 2 Attached Furniture Systems

CI-v4 EQc7:Daylight
posted by  Amanda Gillen  on 

I am working on the documentation for Daylight using Option 2. The Credit form asks that you "describe attached furniture systems included in the simulations". What exactly are they refering to?

0

Regional material distance calculation method

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Lawrence Rennell  on 

According to LEED 2009, there were alternate distance calculations available that applied to products shipped by rail or ship.

0

Greenfield

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Karl Heitman  on 

Our 18 acre project site includes non-build-able waterfront with water detention.

0

LIght Pollution Reduction only applicable to exterior lighting?

NC-v4 SSc6:Light pollution reduction
posted by  Benjamin Weise  on 

Hello!

Do the requirements for the light pollution credit only apply to exterior lighting or do interior lights also need to be evaluated for the credit?

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Wed Sep 19, 2018, 1:40 pm

Is underground Parking included in Certification fees calculations ?

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Amine Zeidane  on 

Hello,

I have an office building project with the following data :

Total GFA (3 underground parking levels + 8 levels above the floor) : 83 108 sf

1
Wed Sep 19, 2018, 3:36 pm

What are the main topics in construction documents that should include LEED requirements ?

NC-v4 IPc1:Integrative process
posted by  Amine Zeidane  on 

Hello,

Is there a document out there to assist in what should be written in construction documents tenders destined for the Construction and MEP companies ?

Thank you

1
Wed Sep 19, 2018, 1:39 pm

Option 2: Is there an alternate compliance method being launced under LEEDv4.1

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Stacey Olson  on 

It appears under LEEDv4.1 O+M, this credit was removed.

We have a site that is 19.1 acres, which equates to a cost of $332,798.40 at $0.40 / sf - a substantial cost for 1 point.

0

Legally adopted and publicly owned water and wastewater service area

ND-v4 SLLp1:Smart location
posted by  Tim Nabholz  on 

How is a legally adopted and publicly owned water and wastewater service area defined.

1
Tue Sep 18, 2018, 7:34 pm

Change of Filtration

NC-v4 EQc4:Indoor air quality assessment
posted by  Michelle Rosenberger  on 

It appears that only an Option 1, Path 1 flushout actually needs to install new filtration media before beginning the process. Why would that not apply to Option 1, Path 2?

1
Tue Sep 18, 2018, 7:21 pm