Forum quick links
Coffee Maker - Energy Star
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Chris Hocknell on
Hi all, I've got a question that I can't seem to resolve.
Automatic Receptacle Controls in 'open offices'
NC-v4 EAp2:Minimum energy performanceposted by Kavita Karmarkar on
The following process load requirement for Automatic Receptacle controls mentions 'open office'.
Indoor Environmental Quality - Quality Views Credit
CS-v4 EQc5:Quality viewsposted by Luis Fretes on
I'm working on a project and looking at the Quality Views Credit, one of the requirements is as follows: "views that include at least two of the following: (1) flora, fauna, or sky; (2)
LEED v4.1 & ASHRAE 90.1-2016
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
LEED v4.1 references ASHRAE 90.1-2016 for the energy model.
Attached to existing building
NC-v4 EQp1:Minimum indoor air quality performanceposted by Omar Elrawy on
I have a new building which is to get attached to my existing non-LEED building. The new prospect LEED NC building is to have a door to access the existing building, so I need to know if I ne
Budget calculation method for build-in cabinetry
NC-v4 EQc2:Low emitting materialsposted by Izabela Kwiecinska on
Hi All,
Large Office building
CS-v4 EAc2:Optimize energy performanceposted by Nasim Mirian on
Our team is working on a large commercial building (13 level of parking+2 levels of lobby+ 37 levels of office space) C&S LEED v4 model. we are using IES VE for the modeling.
Location of recycling bins
Retail-CI-v4 MRp1:Storage and collection of recyclablesposted by Alicia Villanueva on
I have a retail project, that is a makeup store, so the space is divided in two main areas, the first one is operation area (staff only) and second one is a store area (sales floor), on the store a
CO2 Sensors in Naturally Ventilated Spaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nathan Gauthier on
Can anybody confirm if free-standing CO2 sensors that provide a visual alert to the room's occupant only (not connected to the BAS) are acceptable for this prerequisite's monitoring requirement for
ASRS - Baseline LPD Consideration
Warehouses-NC-v4 EAc2:Optimize energy performanceposted by Aravindraj RB on
Hi,