Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Typo in View Factor Chart

NC-v4 EQc8:Quality views
posted by  Chris Edmonds  on 

In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".

0

Documentation requirements

Pilot-Credits IPpc89:Social equity within the community
posted by  Anna K  on 

I am working on a project pursuing IPpc89 Social Equity within the Community under LEED CI, v2009.  We are using Alternative Compliance Path for Option 2 where our project client is also a qua

0

Which calculator should I use?

NC-2009 MRc4:Recycled Content
posted by  Ines Fischer  on 

Hi everyone!! Thanks for all the support in my preovious question 

1
Wed Dec 19, 2018, 11:02 pm

Prerequisites on Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Andrés Felipe Sánchez Sánchez  on 

For version 4, Is it possible to send the Design Final Review without documenting one or more prerequisites.

1
Mon Dec 17, 2018, 3:34 pm

How to control the maximum number of cycles of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Yoyo Shek  on 

Hi All,

How do we control the maximum number of cycles of the cooling tower?

0

Baseline for CI when the CS certification is being carried out simultaneously

CI-v4 EAp2:Minimum energy performance
posted by  Sansiago Velez  on 

This project is a CI fit out for 100% of the leasable floor area of the base building, which is currently being certified as Core and shell.

1
Mon Dec 17, 2018, 3:31 pm
1
Tue Dec 18, 2018, 1:38 pm

Previously developed land

Warehouses-NC-v4 LTc2:Sensitive land protection
posted by  Prakash Sekar  on 

Location: Malaysia

Project type: Warehouse

1
Mon Dec 17, 2018, 2:19 pm

How to control the maximum number of cycles of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Yoyo Shek  on 

Hi All,

How do we control the maximum number of cycles of the cooling tower?

Is it by controlling bleed off rate and make-up water rate? 

Thanks in advance!

1
Mon Dec 17, 2018, 6:23 am

Laminating adhesives in composite wood assemblies

NC-v4 EQc2:Low emitting materials
posted by  Craig Graber  on 

Does the "Composite Wood Evaluation" address shop-applied laminating adhesives used in composite wood assemblies like millwork? I've searched this forum, Ref.

5
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Fri Dec 14, 2018, 11:05 pm