Forum quick links
Occupancy in WEp1 inconsistent with PIf3 form
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ines Fischer on
Hello everyone!
I have the problem that the occupancy of PIf3 is inconsistent with the occupancies used in the WEp1 calculator.
Do outdoor terraces require entrway systems?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Helene Lefkowitz on
Hello - I'm working on a commercial project that has an outdoor terrace on the second floor. Building occupants can use the terrace for outdoor seating and there will be a firepit.
Entryway mats at roof terraces/ gardens and emergency staircase
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by ebru unver on
Hello, For our office project, we are providing permanently installed grilles,on the floor at the 2 main entrances and at the car parking floor before the elevators hall. 1-Do we need also mats for
Existing Canal
NC-v4 SSc4:Rainwater managementposted by Heather Appell on
Can this credit be achieved if some of the rainwater collection is filtered into a canal bordering the project site? TIA!
Buildable land calculations
NC-v4 LTc4:Surrounding density and diverse usesposted by Ricardo Sá on
I would like to clarify which areas shall I include in Combined Density calculations, namely: 1) the buildable land (acres) refers to "portion of site where construction can occur".
Missing Performance Calculator
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Katelyn Smith on
The language in the form asks us to "Provide the completed Minimum Energy Performance Calculator (found under the prerequisite's "Resources" tab in the
Energy Star Equipment - UPS Systems
CI-2009 EAp2:Minimum Energy Performanceposted by Rachel Manoguerra on
I received a general review comment back on this credit regarding the inclusion of the UPS system in our Energy Star Equipment table.
(Sample) Lease Agreement
CS-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
If no tenants have been identified can the project owner claim relevant energy saving from reduced lighting power density using a sample of lease agreement and a letter of commitment in lieu of lea
Glazing required between 30" and 90"
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Ann Lubbers on
I am currently working on a project on which we are hoping to achieve the Views credit. However, the low side of our glazing starts at 3'-0". Does having solid wall between 30