posted by Reshadee Weerasooriya on
Hi, our project team has encountered recertification for two LEED buildings from LEED 2009 as well as LEED v2. The problems we have are,
Waste audit(s) schedule when recertifying a LEED EBOM project
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Vanessa Seibert on
My client's building obtained the MRc6 (Waste Stream Audit) credit four years ago with our LEED EBOM v2009 certification. We did not receive MRc7 (Waste Mgmt of Ongoing Consumables).
Portfolio Manager - All Requests Suspended for Energy Star Scores Until Early 2019
EBOM-2009 EAc1:Optimize Energy Performanceposted by Michelle Bracewell-Musson on
I will assume most are aware that Portfolio Manager has suspended applications for Energy Star Certification from September 2018 until early 2019. As a requirement for EAc1 to be earned,
Existing Building as LCA Baseline
NC-v4 MRc1:Building life-cycle impact reductionposted by Kristen DiStefano on
One of the four options for creating LCA baselines according to this LEED Interpretation - https://www.usgbc.org/content/100002019 - is to use an existing building, and make modifications necessary
Subtraction metering in C&S
CS-v4 EAc3:Advanced energy meteringposted by HoMU WELLTECH on
Good morning,
Double counting Material Ingredients reporting
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Vandita Mudgal on
I think I know the answer, but worth checking with the group.
Residuals Disclosure in HPDv1: "Other" option
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Kena David on
An HPDv1 that we would like to count for credit has "Other" marked under "Residuals Disclosure." Is there any precedent for this counting the HPD for credit?
PI Form 2 Estimated project budget
NC-2009 PIf2:Project Summary Detailsposted by Brian Durgin on
Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.
Ozone treatment
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Dear all, We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone.
Factory-Existing Building
EBOM-v4 EAp2:Minimum energy performanceposted by VISHESH AGARWAL on
I am working on the factory existing building project. the machine load is about 3000 kw.