Forum quick links
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie
Option 2 - Based on GSF, excluding garage area but including garage CDW?
NC-v4 MRc5:Construction and demolition waste managementposted by Michelle Bombeck on
It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in the
ASHRAE 209-2018 and the LEED v4.1beta Integrative Process credit
posted by Rand Ekman on
Friends,
Lighting Controls - ASHRAE 90.1
NC-v4 EAp2:Minimum energy performanceposted by Esteban Martinez on
Hello
Recertification
posted by Pablo Fortunato Suarez on
I was LEED AP for a project that was re-certified in Jan 2017 (v2009 under O+M). What is the timeline for re-certification?
Energy building simulation
NC-v4 EAp2:Minimum energy performanceposted by Tarek on
I took the decision to be a LEED consultant, especially in Energy simulation. so what are the requirements for the LEED certification, qualifications, minimum experience, which program is needed?.
sending back material to Mfgr that was manufactured wrong size, etc.
NC-2009 MRc2:Construction Waste Managementposted by Debra a. Lombard on
Hello,
Does anyone know how USGBC reviewers would want this handled for C&D waste credit?
Seeking a good sustainability consultant in NC
posted by Carolyn Day on
A colleague of mine from another firm is seeking a good sustainability consultant in North Carolina.
What's up with markets for recyclable materials and job-site waste management?
posted by Nadav Malin on
Hi folks,