Forum quick links
SD Leaders 2019 Salary Survey
posted by RoseAnn Grimes on
It’s here! By popular demand we’re re-running the SDL Salary Survey that we last ran in 2015.
Default occupancy for Transportation Terminal
NC-v4 WEp2:Indoor water use reductionposted by Ricardo Sá on
Hi,
2018 Summer SDL Summit - A few spots still available
posted by Jerelyn Wilson on
There are a few spots left for the 2018 Summer Architecture + Design Sustainable Design Leaders Summit that is being held August 1-3 at the Garrison Institute in Garrison, NY (Easy train ride from
Full annual simulation - 365 days only?
NC-v4 EQc7:Daylightposted by Anna Korinkova on
Hello,
I would like to clarify what exactly is meant by 'full annual simulation' for the sDA and ASE (Option 1 of the credit).
Applying MRp2 retrospectively
NC-v4 MRp2:Construction and demolition waste management planningposted by André Harms on
A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.
waste generated from new construction
Mid-Rise-v4 MRc3:Construction waste managementposted by sue bryant on
If you are removing an existing building, can the waste from the building be counted if you are recycling it?
Map generation for submittals
Mid-Rise-v4 LTc2:Site selectionposted by Phil Vanderloo on
How is everyone generating maps for credit submittals required for bicycle networks, bus stops, intersections, open spaces, etc. Thanks
On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Logging requirement for 5 years
EBOM-v4 WEc4:Water meteringposted by Bo White on
What are the requirements for the 5 years of logging in terms of data and in terms of logging interval?