Forum quick links
Compliance without showers on a mixed used project ( MAINLY RSIDENTIAL)
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Guillermo Hernandez Espinoza on
Hi everyone.
Is there anyway to comply if parking spaces is provided for bikes but no showers?
"Performance Period" duration
EBOM-v4 WEp2:Building-level water meteringposted by LEED Pro Consultant on
Hi, I want to know the performance period duration for the water efficiency prerequisite "Building-Level Water Metering". Thank you in advance,
Aerobic Biodigester
posted by Julie Hendricks on
We are looking at installing an aerobic biodigester in a commercial kitchen for an office client that is VERY concerned about zero waste. Basically, this system takes food waste, treats
Modeling Refrigerant Economizer for Data Center - proposed model
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi, We have an office building and it's data center room has a DX cooling with refrigerant economizer.
LEED NC 2009 Documentation
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello,
IAQ testing after occupancy?
Schools-NC-v4 EQc4:Indoor air quality assessmentposted by Gerren Wagner on
Has anyone had success in achieving this credit when testing occurred after occupancy? Our thinking is that the contaminants would test higher after adding people and all the other miscellane
New tip sheet on the major changes
posted by Paula Melton on
The beta has opened, and we have put together a tip sheet on the major changes compared with v4:
Which percentile to use from ITE Tables?
NC-v4 LTc7:Reduced parking footprintposted by Erica Downs on
The v4 reference guide refers users to the ITE 3rd Ed.
VOCs France A+ Class vs France A+ Class & AgBB
NC-v4 EQc2:Low emitting materialsposted by Ian McCall on
Hello, Under General Emissions Evaluation for projects in France (ex. Flooring ): 1) Is a product testing ISO 16000 with French legislation VOC emission class labeling A+ sufficient?
Millworker/Casework Installer CoC
NC-2009 MRc7:Certified Woodposted by Michelle Rosenberger on
We are now seeing review comments about millwork or casework subs not having FSC certification. The reference manual, the addenda and the definition provided on this website all suggest that it is