Forum quick links
Permanently installed drip irrigation system
CS-2009 WEc1:Water Efficient Landscapingposted by Andreas Hintz on
In accordance with the requirements of this credit, the project team has developed and will implement a water-efficient landscape stategy. The project is aiming for Option 2, No Potable Water
Modeling Microturbines in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I'm working on a 5 story hotel in San Jose, Ca. The project is considering adding Microturbines. Has anyone modeled these in EnergyPro? If so, are they modeled in a similar manner
CBE Tool
NC-v4 EQc5:Thermal comfortposted by Sara Hickman on
Does V4 still allow the CBE tool as a form of documentation for LO?
DOAS & VRF for LEED in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I’ve been working on a LEED project with VRF & DOAS in San Jose, CA. For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft.
Outdoor Space
NC-v4 SSc3:Open spaceposted by Daniela Carrillo Lopez on
Would a picnic area with tables and chairs fulfill "a pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities"?
v4 compliant non-shrink non-metallic grout?
NC-v4 EQc2:Low emitting materialsposted by Laura Charlier on
Has anyone come across a v4 compliant non-shrink, non-metallic structural grout that meets ASTM C 1107?
EPD without program operator and/or specific PCR
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Rantanen on
Hi all. Does anyone know whether it is required that an EPD must contain information about the Program Operator and the specific PCR that has been followed when conducting the LCA?
EDR Research Fellowship--please share with university contacts
posted by Z Smith on
Many on this list teach or have strong contacts with university programs, so I'm hoping to leverage our network in service of something that may be of general benefit.
Are Parking areas for Buses and Taxis included in Option 2
NC-v4 SSc5:Heat island reductionposted by Stephan Zweig on
Hello to all,
Do you have any suggestion if I have to include for Option 2 of heat island reduction credit the following:
1) Parking lots for Buses?