Permanently installed drip irrigation system

CS-2009 WEc1:Water Efficient Landscaping
posted by  Andreas Hintz  on 

In accordance with the requirements of this credit, the project team has developed and will implement a water-efficient landscape stategy. The project is aiming for Option 2, No Potable Water

3
Default Avatar
Dipl.-Ing. Architekt, LEED AP (BD+C), BREEAM In-Use Auditor, DGNB Auditor
ikl GmbH
LEEDuser Basic Member
7 thumbs up
Fri Feb 22, 2019, 3:03 pm

Modeling Microturbines in EnergyPro

NC-v4 EAc2:Optimize energy performance
posted by  Joel Embury  on 

I'm working on a 5 story hotel in San Jose, Ca.  The project is considering adding Microturbines.  Has anyone modeled these in EnergyPro?  If so, are they modeled in a similar manner

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 21, 2019, 10:22 pm

CBE Tool

NC-v4 EQc5:Thermal comfort
posted by  Sara Hickman  on 

Does V4 still allow the CBE tool as a form of documentation for LO?

3
Sustainability Director
Retail Design Collaborative + Studio One Eleven
LEEDuser Basic Member
1 thumbs up
Thu Feb 21, 2019, 9:51 pm

DOAS & VRF for LEED in EnergyPro

NC-v4 EAc2:Optimize energy performance
posted by  Joel Embury  on 

I’ve been working on a LEED project with VRF & DOAS in San Jose, CA.  For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft.

1
Fri Mar 8, 2019, 5:02 pm

Outdoor Space

NC-v4 SSc3:Open space
posted by  Daniela Carrillo Lopez  on 

Would a picnic area with tables and chairs fulfill "a pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities"?

1
Thu Feb 21, 2019, 9:58 pm

v4 compliant non-shrink non-metallic grout?

NC-v4 EQc2:Low emitting materials
posted by  Laura Charlier  on 

Has anyone come across a v4 compliant non-shrink, non-metallic structural grout that meets ASTM C 1107?

0

EPD without program operator and/or specific PCR

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Paula Rantanen  on 

Hi all. Does anyone know whether it is required that an EPD must contain information about the Program Operator and the specific PCR that has been followed when conducting the LCA?

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Feb 21, 2019, 6:21 pm

EDR Research Fellowship--please share with university contacts

Green Commons
posted by  Z Smith  on 

Many on this list teach or have strong contacts with university programs, so I'm hoping to leverage our network in service of something that may be of general benefit.

0

Are Parking areas for Buses and Taxis included in Option 2

NC-v4 SSc5:Heat island reduction
posted by  Stephan Zweig  on 

Hello to all,

Do you  have any suggestion if I have to include for Option 2 of heat island  reduction credit the following:

1) Parking lots for Buses?

1
Wed Mar 13, 2019, 1:31 am
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Feb 20, 2019, 6:01 pm