Forum quick links
Are designated smoking areas required?
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Anna Kaelin on
My project prohibits smoking onsite and within 50 ft of the building. There are no designated smoking areas on the property.
Data Centre energy model baseline
NC-v4 EAp2:Minimum energy performanceposted by Ameet AA on
Hello,
For a large data centre, I was thinking the baseline should be:
- HVAC: system 8
- CRAC fan power: Ls x 0.0021 + A as per ASHRAE table G3.1.2.9
Mandatory. lighting controls for Proposed case
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Clarifications on No Cooling Tower Credit.
NC-v4 WEc3:Cooling tower water useposted by Priya Venkat on
Hi,
Clarifications in automatic lighting controls - Occupancy sensor, Programmable dimming control
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
we have industrial manufacturing with office building we have applied LEED V4 NC certification
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by:
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by:
DES Cooling tower
EBOM-v4 WEc3:Cooling tower water useposted by Elyse Dufrene on
Can DES cooling tower serving the project be used to demonstrate water consumption reduction for cooling tower water use credit?
Minimum Indoor air quality compliance procedure - 100% OA AHU with zone level recirculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Greenlab on
Hello Everyone,
Views for Medical Exam Rooms
NC-v4 EQc8:Quality viewsposted by Kyle Ritchie on
Our project is pursuing LEED v4 BD+C certification and is a University building.