Forum quick links
Barriers in implementing Material Transparency in LEED v4 projects
posted by SUSAN THOMAS on
What are the challenges in determining the environmental qualities and human health impacts of building materials or products in LEED v4 projects?
Construction Waste Recycling Plant distance from Site
CI-v4 MRc6:Construction and demolition waste managementposted by Ana Mendoza on
Hello
We are currently working in a location where there aren't any gypsum recycling plant within a 200 mi radius. We have been looking
Design-Build CxA
CI-v4 EAc1:Enhanced commissioningposted by Mark Kohles on
In USGBC's "Who can be a Cxa" document (https://www.usgbc.org/resources/who-can-be-cxa), an independent company, not a member
What is the best value about two different interpretations of a cold room system for LEED points.
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Josée Lupien on
Hello,
We have an issue about how to perform an EPD project for a client.
Our client would like an EPD for their Insulated Metal Panels used for cold room system.
Submeter 2 water subsystems but only one system in the building
CS-v4 WEc4:Water meteringposted by Kristina Pobre on
The credit requires to submeter at least 2 of the following subsystems: irrigation, indoor plumbing fixtures and fittings, domestic hot water, boiler, reclaimed water, and other process water.
Campus project with central plants serving several buildings
NC-v4 EAp2:Minimum energy performanceposted by Yoyo Shek on
Hi All,
Our project composed of several buildings which share a group of main central plants (including several chillers and cooling towers).
Does below approach correct?
Fresh air for toilet vestibule according to ASHRAE 62.1-2010
CS-2009 EAp2:Minimum Energy Performanceposted by Przemysław Rejczak on
Dear Everyone
Can a single room have 3 View Types because of different window views?
NC-v4 EQc8:Quality viewsposted by Danielle Waters on
The project is a fort dormitory where each suite has three windows -- one to the outdoors, second facing another window / outdoors, and third facing into a courtyard/lightw
PI Form 1, Must Use a Reasonable Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Vincent Pieri on
Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundar
Soil restoration and testing
NC-v4 SSc2:Site development - protect or restore habitatposted by Lyle Axelarris on
I'd like to hear from project teams who have successfully pursued this credit. Is the soil testing actually required or is it a means to an end?