Forum quick links
On-Site Renewable Purchase Agreement
NC-2009 EAc2:On-Site Renewable Energyposted by Kristen Gomez on
I am working on a project which install PV panels on the roof.
Infill Development points available for Previously Developed properties?
Homes-v4 LTc2:Site selectionposted by Edward Gulick on
The LEEDv4 for Homes Reference Guide is not explicit on whether a previously developed property is eligible for the Infill Development points. On the one hand, the suggested maximum point tot
Post-industrial and pre-consumer
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Kavita Karmarkar on
Hi all,
Documenting Master Site Credits
posted by Deborah Lucking on
I got this below from the LEED Help Center, which I find really confusing, and does not accord with the current LEED Online for Campus/Master Site format.
SRI value (or range) of FDOT #57 stone
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Heidi Carhide on
I'm working on a governmental project that uses Florida Dept of Transportation #57 stone as a landscaping material. The gravel is quarried in south Florida and is limestone rock. Does a
Calculating Conditioned Area
NC-v4 EAp2:Minimum energy performanceposted by Keith Wallace on
Given a building with all conditioned spaces, what is recommended or required to determine the conditioned area square footage? Do you take measurements from the exterior face of the exterior
Water-less Cooling Tower
CS-v4.1 WEc3:Optimize Process Water Useposted by John Bello on
Our cooling system does not use any water. Instead we are planning to use a R410-a refrigerant. Would this classify for full compliance with Option 2 or Option 3.
non-attainment area for PM2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In Europe which parameters shall be considered to establish whether the site is non-attainment area for PM2.5?
ID+C CI v4 - Innovation: Purchasing - lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Anna McGee on
Hello - We're looking into the Innovation credit for low/no mercury lamps for our CI renovation. The innovation credit has the below notice: