Single Family Homes, MR Credit: Environmentally Preferred Products - Local Production

LEED v4.1 Discussion Forum
posted by  Walter Broner  on 

Apologies if this has been answered already.

Option 1 has a 50% threshold for each building component that could meet the criteria.

0

10% peak demand reduction

NC-v4 EAc4:Demand response
posted by  Yu Zhang  on 

I have a project where DR program is not available, so we are setting up the project to have the infrastructure and developing the plan for demand response.

3
Default Avatar
Energy & Sustainability Consultant
tk1sc
LEEDuser Basic Member
0 thumbs up
Wed Jul 17, 2019, 8:04 pm

Credit: Grid Harmonization

LEED v4.1 Discussion Forum
posted by  Stephan Zweig  on 

Dear Leed User,

I have a question about the Grid Harmonization Credit:

If there is no Demand Response program available could I choose for my project Case 3?

1
Tue Feb 18, 2020, 7:37 am
3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 17, 2019, 6:14 am
1
Mon Aug 26, 2019, 10:32 pm

Incentivizing Decarbonization in Existing Buildings

Sustainable MEP Leaders
posted by  Kim Shinn  on 

I was sitting in on the USGBC's monthly Advocacy call this afternoon and heard about a state-local policy proposal to use property tax incentive for GHG reductions.  Through a state-local part

1
Wed Jul 17, 2019, 9:20 pm

Baseline envelope - Existing Buildings (Retrofit)

NC-2009 EAp2:Minimum Energy Performance
posted by  João Costa  on 

Hello, I would like to ask if anyone has a comment on two questions regarding the baseline model for existing buildings: 1) According to Table 3.1 from Appendix G, thermal loads due to occupancy

4
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Tue Jul 16, 2019, 8:53 pm

July Webinar: Fitwel 2.1 and its new Design Certification option

Green Commons
posted by  Nadav Malin  on 

Hi folks,

Here's the next Peer Networks private webinar. As usual, it will be recorded and shared in the network if you can't make it in person:

7
Director of Sustainable Services
Miron Construction Co., Inc.
LEEDuser Premium Member
40 thumbs up
Tue Jul 16, 2019, 8:37 pm

Showerhead with dual spray settings

NC-v4 WEp2:Indoor water use reduction
posted by  Edgar Arevalo  on 

It is very hard to find a showerhead with 1.00 gpm, but finally found one with WaterSense label.  The only exception is the head has a dual spray setting, which toggles between 1.00 gpm and 1.

1
Tue Jul 16, 2019, 8:05 pm

Future Municipal Greywater System Near SIte WEc1

NC-2009 WEc1:Water Efficient Landscaping
posted by  MANNY IGLESIA  on 

There is a fully funded Recycled Water Distribution System that is due to start by mid this year until the third quarter of 2021.

6
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Tue Jul 16, 2019, 7:45 pm