Adding Green Energy points after final construction review
posted by Susan Di Giulio on
So we have a difficult v2009 project that strained to achieve simple certification. It came back from prelim construction review with only one comment.
Adding PV to a project AFTER Energy efficiency prelim has been accepted in Design Review
posted by Susan Di Giulio on
Hi,
exceptions for farmland?
NC-v4 LTc2:Sensitive land protectionposted by Erica Downs on
We have an infill site on a university campus. Unfortunately, this particular plot of land was previously undeveloped. When checking the soils survey site, a portion of the site comes u
APPA Room Type Definitions
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Alexis Doyle on
Hello,
ROI for LEED at Healthcare Campus
posted by Barbara Hamilton on
Please share any reports or data that exemplifies the ROI of building and operating a LEED building, specifically for healthcare, i.e. Acute Care Hospital and Out Patient Pavillion.
Permanently installed products definition.
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by shashank gangil on
For MR credits, what exactly contributed as permanently installed product? Does AC ducts and insulation counted here?
Fixtures within Lab Facility - Applicable
NC-v4 WEp2:Indoor water use reductionposted by RDK E&S on
Hello,
I'm working on a lab / processing facility aiming for LEED v4 NC certification.
SSpc41 Walkable Project Site
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team pursued this pilot credit and found it to be very achievable for projects in urban settings.
5 Regional Priority Credits
NC-v4 RPc1:Regional priorityposted by Nathan Gauthier on
I was checking the RP credits for LEED v4 NC in Cambridge today and there are only 5 listed (not 6). Boston is the same way.