Signage at Campus Entrance vs. Building Entrance
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Joseph Snider on
We have a project where we have already been through one round of review. Reviewer wants the signage, as expected. The entire campus is no smoking and it says that when you drive on to
Filtered water faucet in Hotel Dwelling Units
NC-v4 WEp2:Indoor water use reductionposted by on
I wrote a couple weeks back, with some questions on the "v4v4 1_Indoor Water Use Reduction Calculator." I just discovered that the dwelling units will have two faucets, one for hand washing,
Canadian Architectural Professionals Declare Climate and Biodiversity Emergency and Commit to Urgent and Sustained Action
posted by Mona Lemoine on
Dear SDLers,
Sign on to support SE 2050 Challenge
posted by Gwen Fuertes on
Apologies if some of you are seeing this for the second time - on behalf of Frances Yang, Mike Gryniuk and the Carbon Leadership Forum, consider signing on in support of the SE 2050 Challenge
Where to input SS credits in Arc?
posted by Drew Hasenkamp on
In my Arc dashboard, under Credits/Actions, I'm only seeing "Data Input" and "Review" and nowhere do I see the option for submitting documents to earn the Sustainable Sites credits in v4.1.
Using Schools option 2 - Pedestrian Access for a Community Service Center
NC-v4 LTc4:Surrounding density and diverse usesposted by nancy picard on
Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2 - Pedestrian Access even if applying for another type pf building?
LRV for baffles
CI-v4 EQc6:Interior lightingposted by Carina Clark on
Curious the best way to calculate SF for spaces that have paint on the structure as well as baffles that hang below.
Higher MERV rated filters
Mid-Rise-v4 EQp5:Air filteringposted by Laura McComb on
Does LEED v4 no longer encourage buildings to use MERV 10 and MERV 13 filters? I've combed though the rating system and no longer see these mentioned.
Fundamental Commissioning of factory building
NC-v4.1 EAp1:Fundamental Commissioning and Verificationposted by Alice Andersen on
I have a question related to fundamental commissioning of a special building - a new factory building with a large processing area and some administration with offices and meeting rooms.