Forum quick links
Water-Side HVAC calculator Baseline and Proposed model inputs
NC-v4 EAp2:Minimum energy performanceposted by Norbert Harmathy on
Dear Sir/Madam,
Theater and Gallery
NC-v4 EQc8:Quality viewsposted by Summer on
We have a museum project that has 3 galleries and theater or performance area.
LEED for Homes with Exterior Energy Uses- Prescriptive
Homes-v4 EAc1:Annual energy useposted by Angela Loughry on
I am working on a home that has significant energy uses not in a HERS rating - exterior pool and snowmelt. I understand that you can go Option 1 under annual energy use. What is unclear
Heat Recovery Exceptions - Baseline Adjustments
NC-v4 EAp2:Minimum energy performanceposted by RDK E&S on
Hi, I'm working on a 2-story 140,000 sf manufacturing facility and wanted some feedback on how to best set up the Baseline. The facility is compromised of a significant amount of office, wareh
CxA Role - Limited central plant installed
CS-v4 EAc1:Enhanced commissioningposted by Ciaran McCabe on
Claim savings with reference to tenant fit out lighting drawings in lieu of tenant lease agreement
CS-2009 EAp2:Minimum Energy Performanceposted by Eric Dixon on
I have a situation where my company has been contracted to design and submit for LEED both the C&S for the building developer, and the CI for the tenant.
Material Reuse Multiplier
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Tommy Linstroth on
If Material Reuse is valued at 200%, the cap of a product not being able to be valued at more than 100% of its total sustainability attributes must now be gone in v4.1?
Envelope Cx Testing
NC-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
I'm working on a project with envelope commissioning. It is a large data center type building.