We have a museum project that has 3 galleries and theater or performance area. The said spaces are enclosed with solid walls since these are the typical design for the museums and will not comply under this credit. Are these spaces considered as regularly occupied space? I'm in doubt on this as these might be excluded as regularly occupied space. Thanks!