Forum quick links
Compliance Strategies and Successes
Pilot-Credits MRpc102:Legal Woodposted by Chris Pyle on
Hi all!
Major Renovation or EBOM?
posted by Christine Recke on
We intend to certify an existing office building which is going to be renovated with the following criteria:
Including ASHRAE Standard 209 in AIA Standard Contract Docs
posted by Kim Shinn on
I have reached out to the AIA staff members that I work with on the Energy Leadership Group (AIA ELG) to see about getting into the cycle of updating these standard documents. Another member
Baseline building: daylight controls
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
my question is related with the need to consider (or not) daylight controls in baseline building. Table G3.1 (bullet 6) from ASHRAE 90.1-2010 states the following:
Hand held Devices for measuring TVOC
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by frederick muscatello on
Does anyone have any hand held meters for measuring TVOC they would recommend?
Purchasing Lamps Calculator
EBOM-v4 MRc2:Purchasing - lampsposted by Jorge Lopez de Obeso on
Hi, I used the current calculator that is on this site but I found out it goes to the max mercury content per bulb instead of the average of the building.
Clarify requirement for design review prior to 50% CDs
NC-v4.1 EAp1:Fundamental Commissioning and Verificationposted by Gail Vittori on
Is it the case that in v4.1, the requirement for a review of the design documents prior to 50% CDs, added with addenda to LEED v4, is no longer a requirement for EAp Fundamental CX in v4.1, but onl
SCAQMD 1168 and CDPH v1.1
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Samantha Lee on
If a product meets the SCAQMD 1168 rule, does that mean it passes the requirements of CDPH v1.1?
LEED guidlines for contractors
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jade Jenkins on
Hello everyone, I am a project manager and we are going out with an ITT soon.
IAQ Management Program - Sample?
EBOM-v4 EQc1:Indoor air quality management programposted by Josue Diaz on
LEED reference guide states that an "IAQ management program" can be a stand-alone document or incorporated into their O&M Plan (developed for EA prereq Energy Efficiency Best Management Practic