Topic | Recent |
---|---|
What does "can include" mean?Healthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Aron Weis on Jan 8, 2013, 3:42 pmcomplications. I'd suggest posting specific questions to those relevant LEEDuser forums. Log in or register to post comments Lindsey Evans Architectural Designer PGAV, Inc. LEEDuser Basic Member 19 thumbs up... Last reply: Jon Clifford, Sep 4, 2014, 12:16 am |
|
MR4 & MR5 Credits LEED 2009 NCNC-2009 MRc4: Recycled Contentposted by Brian Harris on Jan 25, 2013, 12:18 pmwww.BCdesignbuild.com LEEDuser Premium Member 60 thumbs up January 28, 2013- 2:24 pm Brian and Joseph- I have had similar questions within this forum regarding lean fill and imported fill and was given the following... Last reply: Tim Crowley, Feb 19, 2013, 3:56 pm |
|
Building Footprint- Overhanging eavesNC-2009 SSc5.1: Site development - protect or restore habitatposted by Gaston Viau on Dec 6, 2012, 2:55 pm
The roof of our project has overhanging eaves. To calculate the footprint of the building, should we consider the perimeter of the walls at ground level or the perimeter of the roof? Last reply: Lindsay Duthie, Sep 27, 2017, 2:36 pm |
|
Excellent piece, NadavGeneral forumsposted by Rob Watson on Dec 11, 2012, 11:33 am
You clearly and effectively summarized all the problems with the article. Maybe instead of writing my own piece, I'll just copy yours ;-)) Rob Last reply: Sherry Bonelli, Dec 29, 2012, 11:27 pm |
|
Title-24 and DESGeneral forumsposted by Lauren Sparandara on Feb 18, 2013, 7:08 pmbetter suited for a Title 24 forum instead of a LEED forum, but if anyone has any information on how to show Title 24 compliance for a building that is connected to a central plant I would love to hear... Last reply: Eddy Santosa, Apr 24, 2013, 9:28 pm |
|
Submit a Low Mercury ID CreditNC-2009 IDc1: Innovation in Designposted by Joel Register on Feb 28, 2013, 3:40 pm
I would like to use the EB: MRc4-low mercury bulb credit for an ID credit in a LEED-CI project. What is the process in in submitting this as an ID credit. Do I need to submit a... Last reply: Clara Pistoni, Oct 10, 2013, 3:13 am |
|
EAc5 Measurement and Verification Option 3NC-2009 EAc5: Measurement and Verificationposted by Dan Milewski on Mar 4, 2013, 2:10 pm
Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if... Last reply: Marcus Sheffer, Jan 10, 2014, 9:29 am |
|
Green WallCS-2009 EAp2: Minimum Energy Performanceposted by Yoyo Shek on Mar 12, 2013, 11:51 pm
Does anyone have idea if we could model the benefit of using green wall (Vegetated)? Last reply: Yoyo Shek, Mar 19, 2013, 12:06 am |
|
Future-Fit Out Spaces LEED Certified or NotNC-2009 PIf1: Minimum Program Requirementsposted by Catherine Blakemore on Mar 22, 2013, 3:41 pm
My inquiry is in reference to... Last reply: Catherine Blakemore, May 1, 2013, 7:52 pm |
|
LEED Interpretation Rulings-When can they be followed?NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Judy Landwehr on Apr 1, 2013, 6:16 pm
Which of the below statements applies to a... Last reply: Tristan Roberts, Apr 22, 2013, 4:00 pm |