Hi, is Measurement and Verification plan still required for v4 or v4.1?
can someone brief what is required in this plan and in which credit to refer to for this plan?
Thanks
Forum discussion
NC-v4.1 EAc3:Advanced Energy Metering
Hi, is Measurement and Verification plan still required for v4 or v4.1?
can someone brief what is required in this plan and in which credit to refer to for this plan?
Thanks
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.