Forum quick links
Mixed-use projects
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Tatiana Carreno on
What are the requirements for Mixed-Use projects? the guide only refers to residential areas.
If bare raised floor is covered with carpet - is it reused?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Diana Nezamutinova on
1. In our fit-out project in London the base building provides raised access floor that cannot be used as is due to acoustic and aesthetic reasons.
Interior reuse calculation, What is counted?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Mark Ragucci on
Our project is on the second floor of a 3 story building. To start the space has had finishes removed for hazardous abatement before construction demo.
Achieving monitoring requirements
NC-v4 EQp1:Minimum indoor air quality performanceposted by Kelvin Su on
Sorry i posted this under the wrong version before, reposting it her. It is a BD+C v4 project we are working on and struggling a bit with the monitoring requirements for minimum IAQ.
Filtering for direct evaporative cooling
NC-v4 EQp1:Minimum indoor air quality performanceposted by Kelvin Su on
Do we need to meet the filtration requirments for fresh air when using a DEC cooling?
3 Year Plan Management
Pilot-Credits SSpc55:Bird collision deterrenceposted by Elissa Wu on
Is there any strict form or method in which this is to be completed (besides the requirements in the text already)?
Looking for precedent: Owners setting carbon budgets (in capital plans)?
posted by Barbra BatShalom on
Hello Gurus,
Monitoring requirement for individual rooms
NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Kelvin Su on
We are working on a project that is a manufacturing facility with a small percentage of office space.