Forum quick links
how is considered Paris’ tramway ?
NC-v4 LTc5:Access to quality transitposted by Marion THIBAULT on
Hi everyone,
I have some trouble to determine if the Paris’ tramway corresponds to a streetcar or a lightrail regarding the LTc5 credit “Access to quality transit”.
how is considered Paris’ tramway ?
CS-v4 LTc5:Access to quality transitposted by Marion THIBAULT on
Hi everyone,
I have some trouble to determine if the Paris’ tramway corresponds to a streetcar or a lightrail regarding the LTc5 credit “Access to quality transit”.
LEED O+M
posted by Ashraf Elghetany on
Hello,
I need some resources about free LEED O+M practice test as initial study to get an idea about examination,, where can i get it ?
Exterior Lighting
NC-v4.1 EAp2:Minimum Energy Performanceposted by Davide Liviero on
Hello everyone,
Work surfaces in Residential Units?
NC-v4 EQc6:Interior lightingposted by Kristen Magnuson on
Hello,
Option 2 - Strategy F: work surfaces comply but no movable partitions in the project
NC-v4 EQc6:Interior lightingposted by Benjamin Weise on
We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:
Can you get an ID credit on a CI project from being in an EBOM certified building?
CI-v4 INc1:Innovationposted by on
Now that v4 has changed things a bit, I was wondering if I could apply the EBOM cert for an ID credit on my CI projects in a certified building.