Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Seeking photos of protests and/or protest signs, voter lines, etc.

Green Commons
posted by  Paula Melton  on 

Hello! Long shot here, but I thought I would try.

1
Wed Nov 18, 2020, 7:01 pm

Hotel project in remote island

NC-v4 SSc6:Light pollution reduction
posted by  Michael Aghabi  on 

Hello,

We are designing a hotel project in a rural remote area in Saudi Arabia, and have an issue figuring out which Lighting Zone the project falls under. 

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Nov 17, 2020, 3:36 pm

Daylight Simulation Calculations

NC-v4.1 EQc7:Daylight
posted by  Jamie Dubbe  on 

After some research it appears there are a couple of ways to produce the simulation calculations - Insight, LightStanza - however neigther of these are rated as acceptable for use on Depa

0

Difficulty uploading the form

NC-2009 PIf1:Minimum Program Requirements
posted by  Avery Gretton  on 

Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit".

1
Thu Dec 10, 2020, 5:01 pm

Test makeup water or blowdown water?

NC-v4 WEc3:Cooling tower water use
posted by  Omar Elrawy  on 

Dear all,

Should we test makeup water from the water source (incoming), or from inside the cooling tower itself?

1
Tue Nov 17, 2020, 7:15 pm
1
Tue Oct 7, 2025, 5:46 pm

Survey conducted before performance period

EBOM-v4 LTc1:Alternative transportation
posted by  Omar Elrawy  on 

Is it possible to have the survey conducted before even starting the performance period.

1
Tue Nov 17, 2020, 11:40 pm
5
Tue Nov 17, 2020, 6:45 am

LEED Precertification Stages

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Vanessa Montezuma Ramos  on 

Hi everyone, we are currently preparing for the precertification of a CSv4 project.

2
Managing Partner
Innovative Workshop Consulting
LEEDuser Expert
22 thumbs up
Mon Nov 16, 2020, 9:36 pm