Exterior Building Lighting façade - MANDATORY PROVISIONS ASHRAE 90.1 - 2010
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
We are currently developing a large-scale lighting project for which we need to clear up some doubts about ASHRAE 90.1 regulations – section 9.4 – 2010 regarding exterior facade lighting.
Number of Units Required to be Sampled
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Abena Darden on
We are working on a high-rise residential project in San Francisco. I see a question relating to how many residential units need to be blower door tested dating from June 24 2014.
Update and Invitation for FUN! Lighter Side of Green
posted by Barbra BatShalom on
Thanks to those of you who signed up to share your (other) talents!!!
Manufacturing waste for compliance
Warehouses-EBOM-v4 MRc4:Solid waste management - ongoingposted by FARIZAN DAVEZAC on
I have a warehouse with a manufacturing area. The waste from the manufacturing area is already being diverted, as it's collected by a recycling facility.
Biophilic Design
NC-2009 IDc1:Innovation in Designposted by Brightworks Sustainability on
Has anyone successfully pursued Biophilia/Biophilic design as an innovation credit for LEED-NC v3 or v4? If so, what exactly is required? Thank you.
sphagnum peat moss.
NC-v4.1 SSc2:Protect or Restore Habitatposted by Dionisio Franca on
Hi!
Why should't imported soils include sphagnum peat moss? Is it to protect natural habitats with moss?
Can lab surfaces be excluded?
CI-v4 EQc6:Interior lightingposted by Kristen Magnuson on
I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations.
VOC content - all or nothing?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Tommy Linstroth on
Based on this language from USGBC - At least 75% of all paints and coatings, by volume or surface area, meet the VOC 
No Restrooms!
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Diego Pietzsch on
I do have two buildings in the same campus trying to certificate for LEED EBOM.
Performance period
EBOM-v4 EQc7:Green cleaning - products and materialsposted by DAVE LI on
Does the performance period of the provision only take three months or more?