Forum quick links
Do jail cells need to have thermal controls?
NC-v4 EQc5:Thermal comfortposted by on
I am currently working on a project that has short term jail/holding cells that are classified as inidividual occupant spaces.
ASHRAE 90.1-2010 VS. MLO lighting zone
NC-v4 EAp2:Minimum energy performanceposted by Nuttanee Vongveeranonchai on
I am working on a project locating on a commercial corridor of a capital city.
Water fixtures outside the project boundary
NC-v4 WEc2:Indoor water use reductionposted by Thomas Tran on
Dear All,
What is GBCI Docverification_ID?
CS-v4.1 MRc2:Environmental Product Declarationsposted by Ward Miller on
The most recent version of the v4.1 materials calculator on the EPD and Sourcing of Raw Materials tabs has a column that did not exist in the v4 version called, "GBCI Docverification_ID".
AEC SDL firm's sustainability certifications for their offices?
posted by Clark Brockman on
Hi everyone -
Lighting control strategy clarification
Warehouses-NC-v4.1 EQc6:Interior Lightingposted by Ricardo Sá on
Dear All,
Mixing waste from full building with CI
CI-v4 MRc6:Construction and demolition waste managementposted by Jennifer Kruse on
We have a 45 story Core and Shell project in a downtown area with minimal space for dumpsters. This base project is still under construction and not going for LEED. However, within this
Minimum number of charging stations
NC-v4 LTc8:Green vehiclesposted by Summer Minchew on
I note that LEED v4 credit language states: Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project.
Exterior rooftop lighting power allowance
CS-v4 EAp2:Minimum energy performanceposted by Juan Carlos Sanabria Fallas on
Hi all,