I note that LEED v4 credit language states: Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project. The LEED v4 version of this credit includes "or at least two spaces." Can anyone confirm that under LEED v4 there is no minimum, such that you could install 1 EVSE as long as that is representative of 2% of all parking spaces?