Option 2 Natural land cover conditions

NC-v4.1 SSc4:Rainwater Management
posted by  Allen Cornett  on 

With the "retain on site" verbiage is there no longer an option to retain off-site?  I have a project in a development that previous buildings have met the LEED 2009 stormwater&

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Sep 2, 2021, 7:03 pm
2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Sep 2, 2021, 6:12 pm

Concrete Recycled Content

NC-2009 MRc4:Recycled Content
posted by  MT A  on 

We have the final content $ value of cementitious materials and the m3 of concrete produced as supplied by the contractor.

6
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Sep 2, 2021, 3:49 pm

Is there a benefit/penalty with regard to points earned by using this method compared to a 2010 PRM comparison?

Pilot-Credits EApc111:Alternative Performance Rating Method
posted by  Eric Dixon  on 

Has anyone found that they earned more or less points by using the 2016 PRM comparison rather than a 2010 PRM comparison?

0
3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Thu Sep 2, 2021, 2:21 am

Lawn Equipment Inventory

EBOM-v4.1 SSc4:Site Management
posted by  Green Projects  on 

Does this credit require to submit an inventory of all equiptment used?

1
Mon Nov 15, 2021, 7:00 pm

Interiors Project, Whole Building, ID&C or BD&C

LEED Rating System Selection
posted by  Tim Zelazny  on 

Hello -

We have a tenant project where the CD set will be the interior fit-out along with new mechanical systems (ex. RTUs) that will serve the tenant space.

1
Thu May 25, 2023, 7:32 am

November Surprise?

NC-v4.1 MRc5:Construction and Demolition Waste Management
posted by  Jonathan Weiss  on 

I am hoping I read this wrong, but the current version of the credit on USGBC.org and the Addendum posting (as of early November) seems to have changed this credit significantly - Option 1 is 1 poi

22
Director of Sustainability
IPS-Integrated Project Services
LEEDuser Premium Member
1 thumbs up
Wed Sep 1, 2021, 4:53 pm
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Sep 1, 2021, 4:10 pm

Revised Points Thresholds APC

CS-2009 EAc1:Optimize Energy Performance
posted by  Anna Korinkova  on 

We would like to clarify the possible Alternative Compliance Paths (ACP) options for the EAc1 (our project is C&S).

4
Tue Aug 31, 2021, 2:24 pm