EAc3- Enhanced Commissioning, LEED v2009NC-2009 EAc3: Enhanced Commissioningposted by Jared Reed on Apr 22, 2016, 1:50 pm
Our project is pursuing EAc3 - Enhanced Commissioning. The reference manual states that the... Last reply: Scott Bowman, May 2, 2016, 11:37 am |
|
Timeline to File an AppealLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Jason Moody on Apr 29, 2016, 9:55 am
Our project was denied credit due to a failed pre-requisite during the final review. The client once us to file an appeal to address the pre-requisite. How long after the final review is... Last reply: Marcus Sheffer, May 1, 2016, 6:06 pm |
|
Existing Insulated Glass UnitsCS-2009 EAp2: Minimum Energy Performanceposted by Donald Green on Apr 29, 2016, 1:06 pm
We have an existing building whereby some of the existing glass will remain however we cannot determine what the thermal properties of the glass is because there is no documentation and the... Last reply: Marcus Sheffer, Apr 29, 2016, 2:09 pm |
|
Changes to Campus Boundary?Healthcare-v2009 MPR3: Must use a reasonable site boundaryposted by David Gibney on Apr 28, 2016, 4:39 pm
It was recently brought to my attention that our Master Site (under the older "block" registration process) has changed since our original design intent. We are completing the Design credit... |
|
ASHRAE HVAC Apps Handbook Equation, Table 2, and WallsNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Avery Colter on Apr 25, 2016, 8:52 pm
OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook. I have the 2015 Handbook, and there in Section 53.7 is an equation which, adjusted for units, has differential Pa at... |
|
EAp2CI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Peter Doo on Apr 25, 2016, 3:02 pm
If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance... Last reply: Marcus Sheffer, Apr 25, 2016, 3:14 pm |
|
Exemplary Performance?CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by José Solis on Mar 24, 2016, 5:39 pm
The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states... Last reply: José Solis, Apr 25, 2016, 2:47 pm |
|
Room Input ReportNC-2009 IEQc7.1: Thermal comfort - designposted by Bill Friedl on Apr 22, 2016, 11:52 am
I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space... Last reply: Cam Fitzgerald, Apr 25, 2016, 2:12 pm |
|
The envelope data for old building (baseline) are not avaiableNC-2009 EAp2: Minimum Energy Performanceposted by James Lee on Apr 22, 2016, 5:31 pm
Hi, Last reply: Marcus Sheffer, Apr 25, 2016, 11:13 am |
|
Option 1 Path 2 Temperature and Humidty RequirementsNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Amy Harmon on Apr 18, 2016, 5:20 pm
Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH.... Last reply: Dave Hubka, Apr 22, 2016, 10:07 am |