Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
9
principal
Joslin Consulting
LEEDuser Basic Member
140 thumbs up
Thu Jul 28, 2011, 7:50 pm

Exempt compounds

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Paola Figueiredo, Newton Figueiredo  on 

The LEED´s definition of VOC should not be exclude the exempt compounds from the VOC content. However, according to the SCAQMD rules 1113 and 1168, the exempt compounds must be calculated.

2
Sustainability and Environment Director
PROSOCO, Inc.
LEEDuser Basic Member
126 thumbs up
Thu Jul 28, 2011, 6:46 pm

Interior concrete stain

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Chris Sanders  on 

Does interior concrete floor stain fall into the Floor Coatings category, with 100 g/L VOC?

2
Default Avatar
Design/LEED Specialist
The Neenan Company
LEEDuser Basic Member
133 thumbs up
Thu Jul 28, 2011, 5:15 pm

0% Open Space Requirements

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Nándor Kovács  on 

I'm working on a project located in high density urban area which means 100% of the site can be built in the ground floor. How do i have to calculate 25% in this case?

2
Default Avatar
Sustainability Team Leader
Obuda-Ujlak Zrt.
LEEDuser Basic Member
14 thumbs up
Thu Jul 28, 2011, 4:34 am

Re: Promotional code

posted by  David Posada  on 
7
Default Avatar
Project Consultant
Sustainable Design Consulting
LEEDuser Basic Member
20 thumbs up
Thu Jul 28, 2011, 12:58 am

Very good presentation,

General forums
posted by  Nelina Loiselle  on 

Very good presentation, however I can not find the "Opt In" option on my GBCI My Credentials page? According to the presentation we have until Aug. 3rd as the first possible deadline date.

4
Wed Jul 27, 2011, 9:40 pm

Steel structure enamel

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  javier bolanos zeledon  on 

Hi, this is a retrofit of an existing building where all the exterior structural walls are being replaced and also the interior walls.

2
Default Avatar
Director of Mechanical & Industrial Dept.
Dar Al-Handasah (Shair&Partners)S.A.L.
LEEDuser Basic Member
3 thumbs up
Wed Jul 27, 2011, 6:33 pm

SSc4 EBOM v2.2

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Sheryl Swartzle  on 

Our project is 750,000 sf office with 1277 occupants. Project is located in Miami and has it's own parking garage.

4
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Wed Jul 27, 2011, 1:43 pm

Calculating material costs in MRc4 and MRc5

NC-2009 MRc4:Recycled Content
posted by  Alexander Aaltonen  on 

I have similar concerns as Maria described earlier, and I would really appreciate some advice on how to calculate material costs in a case where a sub-contractor is performing concrete works on-sit

2
Wed Jul 27, 2011, 9:45 am

Credit Calculation Options

posted by  Tim Hoeft  on 
4
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Jul 26, 2011, 10:07 pm