Forum quick links
ASHRAE 90.1 2007 Humidification system
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Hi! In Ashrae 90.1 2007 appendix G, in baseline simulation, what is the system type for humidification? (If the proposed building has humidification) Many thanks Ricardo
Kitchen Hood Exhaust and Make-up Air
NC-2009 EAc1:Optimize Energy Performanceposted by Cory Duggin on
What is the correct way to account for kitchen hood exhaust and the consequential 100% OA makeup energy? This is a commercial kitchen and serving area in a hospital. Thanks in advance.
Fan Power Calculation
NC-2009 EAc1:Optimize Energy Performanceposted by Smart Green on
In base case, how to calculate bhp/cfm value for AHUs if we know flow (in CFM) & cooling capacity (btu/h) details?
How much is the allowance for non-flat?
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Gabriela Hernández Castillo on
GS-11 on page 13 says that for non-flat topcoat the v.o.c. limit is 100. Is is 100 or 150 (please take a look at the bird's eye view)?
ASHRAE 90.1 2007 - Evaporative humidifier/ cooler
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Dears Sirs, In ASHRAE 90.1 2007 APPENDIX G, in baseline simulation, when I should use evaporative humidifier/cooler? Many Thanks Ricardo
PV Energy - Sent straight to the Grid
NC-2009 EAc2:On-Site Renewable Energyposted by Sara Heppe on
My project is LEED NC version 2009, and consists of two buildings. One, the Lodge, is the building pursuing LEED Certification.
LEED EBOM 2009 EA Prerequisite 2 & Credit 1 - ACP
posted by Eric Johnson on
Has anyone else noticed that some of the ACP documents state that international projects can't use Energy Star for energy benchmarking or energy performance?
Existing Chiller in 100% building construction refurbishment
CS-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
I am wondering how to handle an existing chiller in a LEED C&S project. The building of the C&S project got 100% refurbishment for the building constructions. The central chiller plant has
Default percentage for removal of TSS by dislodging in a lagoon
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by marisol cano on
Hello to all. Hope you can help me with this one.