SSc5.1 Question

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  jen T  on 

We have a lot of small to medium patches of grass that have multiple trees planted in them.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 30, 2012, 12:42 pm

lease agreement for residential units

CS-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

We are working on a CS muti-unit residential project. Does the lease agreement has to be done for future residents to comply with lighting power density indicated on ASHRAE 90.1-2007?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 30, 2012, 12:15 pm

Calculating Runoff to a Rain Garden

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Christine Robbins-Elrod  on 

Hello, Our project is an adaptive reuse on an urban site that was previously about 95% impervious.

3
Fri Mar 30, 2012, 1:51 am

let the Q&A begin

General forums
posted by  Tristan Roberts  on 

We at LEEDuser are thrilled to be offering this webcast with Lauren from USGBC.

2
Default Avatar
Senior Project Manager
Vidaris, Inc.
LEEDuser Basic Member
4 thumbs up
Fri Mar 30, 2012, 12:53 am

LEED Site Boundary

General forums
posted by  Chris DeVolder  on 

Great forum and good information shared has answered a number of our questions, thanks! On the site boundary for an urban campus public assembly building we're still not 100% on how to draw it.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 29, 2012, 10:51 pm
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 29, 2012, 9:56 pm

Lg AHU serving multiple floors, perform calcs at zone level?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  AAME User  on 

I was brought on to a project to complete the ASHRAE 62.1 calculator after the project was denied LEED EBOM IEQp1. The project consists of two high rise office buildings.

4
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Thu Mar 29, 2012, 4:19 pm

Option 2/ Path 2- Square Footage

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Dominique Arrieta  on 

Our engineer used the net SF for this calculation instead of the gross SF which matches the PI forms. I know this will be a red flag, but does anyone know if this will be acceptable?