Forum quick links
Building Occupants - Daycare Center
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Iris Amdur on
Our office building includes a daycare center, with approx 100 kids on a daily basis. Would the kids be factored into the calculations using the same method of transportation as their parents?
GSF with demolition
posted by Tristan Roberts on
Ruben, I don't see why you would count the section that is to be demolished in the project GSF.
Wastewater management in my project: GIB C14? Innovation Point?
posted by Daniel Costantino on
Hello, The project I am working on will re-use a significant percentage of its wastewater for irrigation purposes.
For Project outside US, Target Finder seems invalid?
CS-2009 EAp2:Minimum Energy Performanceposted by yu-ju Kao on
Our project is located in Asia, and the Target Finder is to compare the project to a US national database, I assumed that it does not work for projects outside US.
Can Atriums or shaded open spaces still qualify for the credit?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ahmed Mosa on
In hot humid climates we tend to shade open spaces or design it as an Atrium, and since it's a "pedestrian oriented accessible space" would this space still qualify for SS C5.2 ?
Pre Development Determination
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jennifer Preston on
Our site was recently demolished, filled with dirt and left for some time.
FSC wood, but not FSC shop. Buy FSC anyway?
CI-2009 MRc7:Certified Woodposted by Valerie Molinski on
We are pursuing MRc7 on a project that I am working on, but the millwork shop does not have a COC certification.