Forum quick links
CO2 sensor in kitchen & others
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Guillermo T. Adamo on
Hi, we are working in a Gas station with three different type of spaces. 1) Individual offices with one or two employees, naturally ventilated.
ASHRAE 62.1 Calculator
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sundararaj Subburaman on
Please guide on how to determine Ds - Percent design primary air flow for worst case condition?
LEED - H compared to LEED - NC
posted by Abena Darden on
Tristan-Have you ever seen a formal comparison done between Homes and New Construction (2009)?
Surrounding Density and Diverse Uses
posted by Julie Hendricks on
I can't help but notice that the new credit is double the amount of documentation for the same number of points-- and arguably, the same amount of environmental benefit-- as LEED 2009.
The baseline U-values
Schools-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
The baseline U-values proposed by ASHRAE 90.1-2007 for a building with high thermal mass in climate zone 1 (see below extracted from table 5.5-1) seem to be too low-performing. Are these correct?
Group Certification for two small office buildings?
posted by Maria Porter on
I think group certification would be a good option for my two identical (mirrored) buildings on the same property with the same owner.
Preferred parking outside the LEED boundary
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gabriela Hernández Castillo on
Our project's parking goes beyond the LEED boundary, since it is a mixed used building with several towers and only one of them will apply for LEED certification.
have 44" to 68" perimeter glazing at a library
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Joseph Bace on
For only 2" above the 42" sight line requirement do you think a special circumstance is viable for LEED to possibly award the credit or is it better to do the calculations for the standing occupant
DOAS for baseline model
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
If the proposed HVAC design has DOAS that delivers OA to all AHU's, should there be the same auto-sized capacity but the same air flow DOAS for the baseline?