Topic | Recent |
---|---|
50% Post consumer contentLEED v5 O&M Existing Buildings 2nd Public Commentposted by Todd Dayton on Oct 17, 2024, 12:02 pm
In Class A office most paper available is 30% post consumer content. There are some brown paper versions that meet 50% content. Setting this level of standard to points on LEED paper usage seems... |
|
Tenant water meteringCS-v4 WEc4: Water meteringposted by Anya Fiechtl on Feb 13, 2022, 3:06 pm
Can a Core&Shell project achieve this credit by submetering tenant water use? Last reply: Michelle Bombeck, Oct 17, 2024, 2:42 pm |
|
ROhS DirectiveHealthcare-v2009 MRc4.2: PBT source reduction - lead, cadmium and copperposted by Gustavo De las Heras Izquierdo on Feb 27, 2014, 8:32 pm
Is the ROhS Directive a valid approach for demonstrating the cable meets the credit requirements? Please check this out: http://www.... Last reply: Alok Negi, Oct 18, 2024, 7:16 am |
|
LEED ID+C Information not available about mechanical systemNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Oct 16, 2024, 11:34 am
Hi, I am working on an old building built in 1970s and there is no information on mechanical system availiable regarding COPs , what can I do in this case, I am sure the systems... Last reply: Marcus Sheffer, Oct 18, 2024, 11:54 am |
|
Medical space types not listed in the Minimum IAQ Performance CalculatorHealthcare-v4 EQp1: Minimum indoor air quality performanceposted by Edgar Arevalo on Oct 18, 2024, 3:16 pm
I am currently working on a LEED v4 Healthcare project, and the Minimum... Last reply: Cory Duggin, Oct 18, 2024, 3:20 pm |
|
14 days VOC Emissions RateCI-v4 EQc2: Low-emitting materialsposted by Alokmay Behera on Oct 19, 2024, 6:45 am
One of the internal paints in the project is Greenguard Gold Certified. The... |
|
Measurement and Verification for v4 or v4.1NC-v4.1 EAc3: Advanced Energy Meteringposted by Mu'ath Ad on Oct 19, 2024, 6:12 am
Hi, is Measurement and Verification plan still required for v4 or v4.1? can someone brief what is required in this plan and in which credit to refer to for this plan? Thanks Last reply: Marcus Sheffer, Oct 19, 2024, 12:58 pm |
|
LTc4 and buildable landNC-v4 LTc4: Surrounding density and diverse usesposted by Jacopo Cattaruzzi on Oct 21, 2024, 8:33 am
Hi, I am following a project of a hotel complex located in the Italian alps. We are aiming at achieving points from LTc4 opt. 1 and I am a bit confused about... |
|
Design for Indoor Air Quality and Infection ControlPilot-Credits EQpc124: Performance-based indoor air quality design and assessmentposted by Rihab Joucht on Oct 21, 2024, 10:40 am
Hello everyone! I'm pursuing this pilot credit for a LEED v4 NC warehouse building and office, located in Longueuil. Any tips to share ? |
|
Utilize emergency generator for peak demand reductionNC-v4.1 EAc4: Grid Harmonizationposted by Brightworks Sustainability on Oct 19, 2024, 5:54 pm
Hello, The project includes fossile fuel based emergency generator. Can we utilize the energency generator to comply with GH credit intent? Last reply: Marcus Sheffer, Oct 21, 2024, 1:52 pm |