Forum quick links
How to calculate 50% in a hotel
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Robert Robison on
Am I allowed to include the thermostats in each guest room when I calculate the 50% of building occupants who have access to individual comfort controls? Also - how do I search the forum?
Window Film
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by AshLee Eustace on
Has anyone submitted for this credit using window film for a glare reduction technique?
Mandatory Re-Certification - Really?
posted by Russell Perry on
I have heard from several people that the recent USGBC Webinar included that startling statement that projects certified under LEED would be required to undertake re-certification on some unspecifi
Appendix G, ASHRAE-90.1-2007
NC-2009 EAc1:Optimize Energy Performanceposted by Divjot Singh on
For HVAC System in Baseline case of modelling, it says: "Operate fan contiuously when spaces are occupied and cycle it during unoccupied hours".
School as a TeachingTool - clarifications?
Schools-2009 IDc3:The School as a Teaching Toolposted by Anya Fiechtl on
The Principal at our school project asked a couple of questions about their sustainability curriculum program that I was unable to find a solid answer for: 1.
Paints in parking lot.
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by gabriel Morales on
Mara, I hope you are well, a doubt: the credit applied to the paintings of parking specifically in the paint that goes on the floor to indicate the separation of parking spaces? Parking is underg
Certify ONLY One Office Space Within a Building?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Michelle Bracewell-Musson on
Is EBOM limited to certifying the WHOLE building?
HVAC Control
CI-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
Hello, I'm working in a project that has 2 meeting room of 7 m2 next to each other and one of meeting room is exposed to exterior window.
Manufacturing Plant
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Nelina Loiselle on
My client operates a prosthetics manufacturing plant. There is no benchmark in ENERGY STAR for this kind of facility. I know it will not be eligible for an ENERGY STAR rating.