Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Steel

NC-2009 MRc5:Regional Materials
posted by  Lu Anne Nielsen  on 

I've heard that the location should be taken from where the steel in formed (manfactured) to determine the milage for Regional Materials since it is difficult to document the extraction location.

2
Environmental Business Development- LEED AP BD&C
Nucor Corporation
LEEDuser Basic Member
132 thumbs up
Mon Jun 4, 2012, 9:24 pm

A call to hit the 'pause' button on LEEDV4..formerly 2012 ;-)

General forums
posted by  Rob Watson  on 

Friends-- I'd like to start a bit of a straw polling process here predicated on the idea that delaying the ballot significantly (6 months or more) is in the best interests of USGBC, LEED and the en

43
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Jun 4, 2012, 9:12 pm

Multiple Use Highrise Baseline Building(s)

NC-2009 EAp2:Minimum Energy Performance
posted by  Wes Lawson  on 

Hello, We have a situation where we are attempting to model a highrise building of approximately 450,000 square feet. The predominant use of this building is residential.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jun 4, 2012, 6:15 pm

Residential, Option 3

Doing the Alternative Commuting Transportation Survey
posted by  Erin Nuckols  on 
We are working on a project that is a university Residence Hall on campus.
2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Mon Jun 4, 2012, 5:12 pm

spaces,zones and systems in the energy model

NC-2009 EAp2:Minimum Energy Performance
posted by  Tarek Dalati  on 

do the spaces,zones and air systems in the baseline should have the same names as in the proposed design and the ones in the upploaded drawings? in the mechanical equipments schedules the engineer

3
Default Avatar
Sustainbility manager
CRHI
LEEDuser Basic Member
70 thumbs up
Mon Jun 4, 2012, 5:01 pm

electrical room/swimming pools cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Tarek Dalati  on 

is the electrical rooms and internal swimming pools cooling is considered as a process load or not? and what leed reviewer should see in the energy model output. regards

11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jun 4, 2012, 2:51 pm

How do we show compliance with CEN standards in IEQp1?

General forums
posted by  Maria Porter  on 

In order to show compliance with CEN standard for IEQp1, what exactly do I upload?

16
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Mon Jun 4, 2012, 2:09 pm

Building Area Method applicable for Multi-use-building

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco Abdallah  on 

Assuming a 10 storey building where the first three floors are retail floors and the remaining 7 floors are office floors, is it generally possible to use the building area method? Is it possible t

5
Mon Jun 4, 2012, 1:06 pm
34
Director of Client Engagement
Natural Capital Partners
LEEDuser Basic Member
42 thumbs up
Fri Jun 1, 2012, 7:26 pm

LEED Online, Reference Guides, User Friendly Documentation

General forums
posted by  Michelle Teague  on 

LEED Users, what are your thoughts and experiences with LEED Documentation?

9
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Fri Jun 1, 2012, 6:55 pm