Topic | Recent |
---|---|
SS Credit: Rainwater Management- Option 2- Natural land cover conditionsCS-v4.1 SSc4: Rainwater managementposted by Finance Team on Sep 14, 2024, 8:42 am
Hi All, We are working on a major renovation of an office project (shell only) and aim to certify it under the LEED v4.1 BD&C CS scheme. The project site is 2,000 m², with a... Last reply: Finance Team, Sep 17, 2024, 5:19 pm |
|
Clarification Needed on Reporting Bus TripsNC-v4.1 LTc5: Access to quality transitposted by on Sep 17, 2024, 1:12 pm
I’m seeking clarification on a matter related to daily trip reporting for our local transit system. We have multiple buses running simultaneously on certain routes. For instance, the local Route... Last reply: Andrey Kuznetsov, Sep 18, 2024, 2:50 am |
|
Clubhouse Building Type? Public Assembly or Non-Residential?NC-v4.1 EAc2: Optimize Energy Performanceposted by Junaid Mujahid on Sep 3, 2024, 1:47 am
A clubhouse project with amenities including: Gymnasium, Yoga/Aerobic Studios, Party Hall, Dining Hall, Lounge, Small Retail Stores, Prayer Rooms, Basement Parking should be categorised under... Last reply: Junaid Mujahid, Sep 18, 2024, 4:00 am |
|
What Documentation- Specs or Submittals? Cadmium and Lead Paint still an issue for NEW Paint?Healthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Heather Ane Zeto on Sep 18, 2024, 10:18 am
2 questions in 1!
|
|
Reheating more than 30% at the VAVNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Sep 17, 2024, 12:29 pm
I am becoming involved with a project that is being designed to reheat more than 30% of the max cooling airflow rate at the... Last reply: Dave Hubka, Sep 18, 2024, 11:28 am |
|
Building reuse plus additionNC-v4.1 MRc1: Building life-cycle impact reductionposted by Erica Downs on Sep 1, 2021, 5:34 pm
Can someone please clarify if the entire project (including additions) is used as the "denominator" for this credit? Or only the existing building that is being resused? I am finding the credit... Last reply: Lorax Partnerships, Sep 18, 2024, 4:31 pm |
|
Excluding spaces from the project's LEED BoundaryCI-v4 MPR2: Must use reasonable LEED boundariesposted by Nadia Azzam on May 18, 2023, 4:34 pm
Hello, We are currently designing office space that will occupy a portion of the 1st level and the entire 3rd level of a building, with a staircase connecting the... Last reply: Andrey Kuznetsov, Sep 18, 2024, 10:42 pm |
|
REACH OptimizationNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Sandra Moran on Jan 23, 2018, 9:52 am
Project is N America (outside USA). Manufacturer is Europe HQ with global operations; uses European standards for global manufacturing. Materials will be produced in USA/ shipped to project... Last reply: Josef Andersen, Sep 19, 2024, 5:33 am |
|
LEED Water Side Calculator for DES1NC-v4 EAp2: Minimum Energy Performanceposted by elvin ruya on Sep 12, 2024, 5:06 pm
Hi, I was wondering if anyone knows the requirements for the secondary pump controls under the... Last reply: Tyler Thumma, Sep 19, 2024, 8:24 am |
|
How to show the GHG Emission calculation for the new Energy updateCI-v4 EAp2: Minimum Energy Performanceposted by Nagaraj Sankar on Sep 12, 2024, 3:37 pm
Dear Kudos, One of our LEED V4 ID+C: CI projects has been registered following the new energy update (effective after April 2024). As per the updated requirements, we are required to... Last reply: Tyler Thumma, Sep 19, 2024, 8:54 am |