electrical room/swimming pools cooling

NC-2009 EAp2: Minimum Energy Performance
posted by Tarek Dalati on Jun 4, 2012, 2:15 am

is the electrical rooms and internal swimming pools cooling is considered as a process load or not?
and what leed reviewer should see in the energy model output.

regards

Last reply: Erin Adkins, Jun 4, 2012, 10:51 am

Excluding Soil Brought in from Off-site

NC-2009 MRc4: Recycled Content
posted by Margaret McColl on Oct 12, 2012, 11:36 am

Hello,

I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site. The...

Last reply: Tim Crowley, Nov 27, 2012, 8:34 am

System fan power- Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by Luana Bertoletti on Oct 16, 2012, 10:41 am

Hi,

I have a doubt related to the system fan power calculation described in section G.1.2.9.
This section states that "system fan electrical power for supply, return, exhaust, and...

Last reply: Marcus Sheffer, Feb 11, 2013, 10:34 am

LEED Interpretation: get recycled content figures by plant

NC-2009 MRc4: Recycled Content
posted by Tristan Roberts on Oct 31, 2012, 10:06 am

LEED Interpretation #10246, out on 10/1/12, makes a pretty big change to documentation requirements for MRc4 (effective for...

Last reply: Tristan Roberts, Jan 30, 2013, 12:02 pm

ISO 140001 Certification

NC-2009 IDc1: Innovation in Design
posted by kathy zarsky on Nov 27, 2012, 6:45 pm

Has anyone had any success in receiving an innovation credit point for this with LEED version 2009?

Last reply: Anna Foden, Dec 18, 2020, 12:28 pm

CxA contracting for enhanced commissioning in a design&build pro

NC-2009 EAc3: Enhanced Commissioning
posted by Valentin Grimaud on Nov 29, 2012, 7:38 pm

Dear All,

We have a 300,000sqft project, quite technical facility.

It is a design&build contract and the owner is reluctant on taking independent contracts on his own. In...

Last reply: Scott Bowman, Jul 18, 2013, 12:38 pm

guestrooms keycard: power adjustment for automatic lighting ctrl

NC-2009 EAc1: Optimize Energy Performance
posted by Habitech Distretto Tecnologico Trentino on Feb 27, 2013, 8:57 am

This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off. Can credits be taken in the proposed case for...

Last reply: Marcus Sheffer, Mar 21, 2018, 2:39 pm

Template Rounding for Design Case-Urinal

CI-2009 WEc1: Water Use Reduction
posted by Rebekah Burke on Mar 27, 2013, 4:03 pm

We have completed our template with all fixtures included and are at 39.97% savings!!! UGH. As we dig into the template to see if there is a way to reach that 40% threshold, and thus 3 more...

Last reply: Sydney Hanson, Jan 20, 2015, 7:06 pm

Update documentation for previously awarded/anticipated credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Jorng-ren Chern on Apr 12, 2013, 2:20 am

Our project has submitted for the Design Review and some credits have been marked as anticipated. However, some changes have occurred during the construction and we would like to update the...

Last reply: Olga G. Alvarez, May 31, 2020, 4:39 pm

Choose the right one?

NC-2009 EAc1: Optimize Energy Performance
posted by Robert Sutton on Apr 30, 2013, 2:09 pm

Determine the interior lighting power allowance by
using the columns designated Space-by-Space Method
in Table 9.6.1. Multiply the floor area(s) of the space(s)
times the...

Last reply: Robert Sutton, Apr 30, 2013, 10:18 pm