Getting Credit for Demand Control Ventilation in the Optimize Energy Performance creditNC-v4 EAc2: Optimize Energy Performanceposted by Mark Terpstra on Apr 5, 2023, 6:56 pm
I have a project with a CO2 sensor in the return air duct of a workshop in a school. The energy modeller is taking credit... |
|
Can Technical School's Automotive Dept reserved spaces be excluded?Schools-NC-v4.1 LTc8: Electric Vehiclesposted by Danielle Waters on Apr 6, 2023, 10:17 am
Our project is a Technical High School with an Automotive Department, which is reserving 35-40 parking spaces for their own storage of to-be-fixed vehicles. Can these spaces be treated similarly... |
|
Energy Simulation SoftwareNC-v4 EAp2: Minimum Energy Performanceposted by on Apr 6, 2023, 10:19 am
Is anyone using OpenStudio or another free or inexpensive EnergyPlus based software for there energy simulations? |
|
Wooded Area as open space?NC-v4.1 SSc3: Open spaceposted by Nadia Azzam on Apr 6, 2023, 4:52 pm
Would a wooded area with lots of trees count as open space for this credit? Our project is surrounded by wooded areas that are basically... |
|
Metering of chilled waterNC-v4 WEc4: Water meteringposted by Nadia Azzam on Apr 6, 2023, 5:54 pm
Our project comprises of two buildings- building 1 is existing, building 2 is new. We are only seeking LEED certification for building 2. My questions with regards to water metering requirements... |
|
Waste ScoreEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Apr 7, 2023, 3:59 am
Is there a reference or a list showing the waste score for the baseline buildings? Can a project predict what percentage of... |
|
Zero Lot Line with required streetscape?NC-v4.1 LTc6: Bicycle facilitiesposted by Elena Khoury on Apr 10, 2023, 6:41 pm
Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/... |
|
Zero Lot Line with required streetscapeNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Elena Khoury on Apr 11, 2023, 11:42 am
Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/... |
|
Grid Harmonization- Case 3: Load Flexibility and management strategiesLEED v4.1 Discussion Forumposted by Caterina Panteghini on Apr 12, 2023, 9:27 am
Hi, Case 3 refers to a regional grid load profile... |
|
Denied Credits in Precertification ReviewLEED v4.1 Discussion Forumposted by Amjad Ali H Ahmadalshteihi on Apr 13, 2023, 8:42 am
If any credit is denied during the Precertification Final Review Phase, can it be changed for the Design Review without having to Appeal? |