Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Irrigation Efficiency - IE for Hunter irrigation products

NC-2009 WEc1:Water Efficient Landscaping
posted by  Ricardo Sá  on 

Has anyone have or had any experience with irrigation systems provided by Hunter Indutries? I contacted them in order to obtain information regarding the IE value for their irrigation equipments, a

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Thu Sep 6, 2012, 3:00 am

Task Lighting

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Dominique Arrieta  on 

We have been denied IEQc7.1 due to not showing task lighting at each individual workstation.

3
Thu Sep 6, 2012, 12:50 am

Denied Project Information form?

General forums
posted by  Renee Shirey  on 

Has anyone ever had a denied PI form? It isn't an actual credit, so how do you "fix" it? IS an Appeals process actual required, since it isn't a credit or prerequisite?

4
Wed Sep 5, 2012, 11:30 pm

Outdoor seating. Hardscape or not?

Schools-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Carly Ruggieri  on 

A school project of mine will be installing a small amphitheatre-style seating area in the exterior play yard.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 5, 2012, 9:00 pm

No-Smoking Policy

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Maura Adams  on 

My building is on a campus with a no-smoking policy, but employees can smoke in personal vehicles.

7
Environmental Stewardship Manager
LEEDuser Basic Member
114 thumbs up
Wed Sep 5, 2012, 8:25 pm

Initial certification for existing building

LEED Rating System Selection
posted by  gloria cheng  on 

We are going to have a LEED for a existing building. For the initial certification, should we using the rating system - LEED for Existing Buildings: Operations & Maintenance?

3
Wed Sep 5, 2012, 6:54 pm

Proposed model, CAV system without cooling system

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

In the proposed building that I’m modeling there is a CAV system without cooling system (in the AHU a water coil is heated by hot water). How shall I model the cooling system?

3
Wed Sep 5, 2012, 4:19 pm

Building Area Method used at whole building simulation

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco Abdallah  on 

Assuming that I use the BAM for showing compliance with the minimum energy performance prerequisite do I have to use the BAM also at the simulation for EAc1? It would be more meaningful to use the

3
Wed Sep 5, 2012, 4:09 pm

District heating: App G 3.1.1.1 purchased heat

CS-2009 EAc1:Optimize Energy Performance
posted by  Marco Abdallah  on 

We just got a review with the comment: >> If DESv2 is NOT used, and the project is receiving district heating, the district heating must be modeled in accordance with ASHRAE Appendix G requi

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 5, 2012, 2:38 pm

Warehouse - non regularly occupied

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Heather Hocklander  on 

Has anyone been successful in exempting warehouse space from the views calculations by classifying the warehouse space as a non-regularly occupied space in a GBCI review?

4
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Wed Sep 5, 2012, 1:50 pm