Forum quick links
Operational Guidelines for Educational Facilities: Custodial
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Michael Smithing on
It appears that the guidelines references in the LEED 2009 manual have now been revised and are no longer available.
How does LEED define a bicycle space?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Rick Servoss on
Does LEED have any requirements on spacing or the type of bike racks used? Can crowd control or wheel bender type racks meet the credit requirements? How does LEED define a bicycle space?
Commuter Rail = Amtrak?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Rebekah Burke on
Looking for some experience or assistance with the definition of 'commuter rail'. Would an Amtrak station qualify as a commuter rail station?
Material Cost - Contractor's cost or manufacturer's cost?
NC-2009 MRc4:Recycled Contentposted by Keith Steurer on
When establishing the material cost for MR credits, is the cost of materials defined by what the general contractor pays to buy a product or what the manufacturer pays to manufacture a product?
Permanently Dimmed LED Lamps
CI-2009 EAp2:Minimum Energy Performanceposted by Luis Miguel Diazgranados on
Greetings Everyone, We are working in a CI project, in which, by error, the lightning contractor obtained some LED bulbs with a larger wattage than the lightning designer specified wattage.
MRc5, Furniture and Medical Furnishings
posted by Elizabeth Powers on
I have a couple of questions under this credit and would greatly appreciate any feedback LEED User members might have. Question #1: The credit states that "all freestanding furniture and medical f
Spreadsheet for Data Centers
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Hi, I can´t find the spreadsheet “A Data Center Power Train 1-150170-11A”. I want the latest version the spreadsheet available.
Non-Predominant Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
We are modeling a building that is separated into three different spaces. These spaces have differing functions, schedules and systems.
Construction Costs
NC-2009 MRc4:Recycled Contentposted by Benjie Herrera on
If we will be using the 45% default for the Construction Cost, How do I determine the Construction Cost? Is it the Constact Amount Value Less the Electrical,Mechanical,Eqpt,Specialty Eqpt. costs?