Operational Guidelines for Educational Facilities: Custodial

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  Michael Smithing  on 

It appears that the guidelines references in the LEED 2009 manual have now been revised and are no longer available.

3
Fri Oct 5, 2012, 1:01 pm

How does LEED define a bicycle space?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Rick Servoss  on 

Does LEED have any requirements on spacing or the type of bike racks used? Can crowd control or wheel bender type racks meet the credit requirements? How does LEED define a bicycle space?

3
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
23 thumbs up
Fri Oct 5, 2012, 2:08 am

Commuter Rail = Amtrak?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Rebekah Burke  on 

Looking for some experience or assistance with the definition of 'commuter rail'. Would an Amtrak station qualify as a commuter rail station?

2
Associate Vice President
CannonDesign
LEEDuser Premium Member
55 thumbs up
Fri Oct 5, 2012, 1:57 am

Material Cost - Contractor's cost or manufacturer's cost?

NC-2009 MRc4:Recycled Content
posted by  Keith Steurer  on 

When establishing the material cost for MR credits, is the cost of materials defined by what the general contractor pays to buy a product or what the manufacturer pays to manufacture a product?

2
Structural Engineer
Shive-Hattery, Inc.
LEEDuser Basic Member
25 thumbs up
Thu Oct 4, 2012, 6:26 pm

Permanently Dimmed LED Lamps

CI-2009 EAp2:Minimum Energy Performance
posted by  Luis Miguel Diazgranados  on 

Greetings Everyone, We are working in a CI project, in which, by error, the lightning contractor obtained some LED bulbs with a larger wattage than the lightning designer specified wattage.

6
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Oct 4, 2012, 5:22 pm

MRc5, Furniture and Medical Furnishings

LEED for Healthcare forum
posted by  Elizabeth Powers  on 

I have a couple of questions under this credit and would greatly appreciate any feedback LEED User members might have. Question #1: The credit states that "all freestanding furniture and medical f

4
Thu Oct 4, 2012, 3:51 pm

Spreadsheet for Data Centers

NC-2009 EAc1:Optimize Energy Performance
posted by  Ricardo Marques  on 

Hi, I can´t find the spreadsheet “A Data Center Power Train 1-150170-11A”. I want the latest version the spreadsheet available.

3
Thu Oct 4, 2012, 2:43 pm

Non-Predominant Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Wes Lawson  on 

We are modeling a building that is separated into three different spaces. These spaces have differing functions, schedules and systems.

7
Default Avatar
Mechanical Engineer
SNC-Lavalin Project Services Inc.
LEEDuser Basic Member
0 thumbs up
Thu Oct 4, 2012, 1:43 pm

Construction Costs

NC-2009 MRc4:Recycled Content
posted by  Benjie Herrera  on 

If we will be using the 45% default for the Construction Cost, How do I determine the Construction Cost? Is it the Constact Amount Value Less the Electrical,Mechanical,Eqpt,Specialty Eqpt. costs?

2
LEED AP bd+c - Sr. Architect
Midrar Development Management
LEEDuser Basic Member
16 thumbs up