Concept Designers as CxA?

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ward Miller  on 

The project in question is a design and build project for which the general contractor will be assigned the project's design and construction activities; however, there is an architectural and engi

12
Chief Environmental Officer
Alpenglow Advisory
LEEDuser Basic Member
44 thumbs up
Fri Oct 19, 2012, 3:33 pm

Can AE-1 be CxA?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  ANNE JURAN  on 

We prepared the RFP (or bridging documents) for a design-build project.

4
Director of Commissioning & Critical System
Edwards & Zuck
LEEDuser Basic Member
29 thumbs up
Thu Oct 18, 2012, 9:29 pm

Compliance?

CI-2009 EAp2:Minimum Energy Performance
posted by  Alex AC  on 

Hi LEEDuser community, I have read some old posts regarding this issue, but I still want to double check with you guys. I hope you don´t mind.

3
Default Avatar
LEEDuser Basic Member
5 thumbs up
Thu Oct 18, 2012, 9:11 pm

DES: virtual rate and efficiency

CS-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all, according to the document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”, for Option1: Virtual District Hot Water Rate [$/MBTU] =

3
Head of Sustainability
Manens S.p.A.
LEEDuser Premium Member
16 thumbs up
Thu Oct 18, 2012, 7:08 pm

single stream recycling

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Courtney Royal  on 

Our project is located in Ithaca, NY and curbside recycling pickup has moved into a single stream recycling collection.

3
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Thu Oct 18, 2012, 6:41 pm

Green Roof modeling for EAc1

NC-2009 EAc1:Optimize Energy Performance
posted by  Kalyan Nishtala  on 

Hi All, I am modeling a 350,000 sqft dormitory/dining hall located in NY. Part of the roof of this building green roof (approximately 10%).

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 18, 2012, 5:55 pm

Establishing baseline system

NC-2009 EAc1:Optimize Energy Performance
posted by  Kari Krolikowski  on 

My project consists of the following types of spaces: 1. Office: 2,300 SF 2. Manufacturing / laboratory: 24,055 SF 3. Warehouse: 26,905 SF 4.

5
Default Avatar
Mechanical Engineer
SNC Lavalin
LEEDuser Basic Member
1 thumbs up
Thu Oct 18, 2012, 3:49 pm

Signage Shared?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Joseph Greene  on 

We are required to designate 12 carpool spaces for our LEED project and plan to install pole mounted signs.

2
Thu Oct 18, 2012, 3:36 pm

G3.1.2.9 and Miscellaneous Exhaust Fan Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Edwards  on 

Section G3.1.2.9 says that baseline "system fan electrical power for supply, return, exhaust, and relief (excluding power to fan-powered VAV boxes) shall be calculated" using the formulas given.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 18, 2012, 3:25 pm

Performance Period

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Paola Figueiredo, Newton Figueiredo  on 

Our team submitted a project demonstrating that the building had its performance period for a specific credit done during one (1) year, although the changes and alterations had been made during two

4
Thu Oct 18, 2012, 3:17 pm