Topic | Recent |
---|---|
Energy and AtmosphereLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:15 pm
Adding PV panels to an existing building can impact the fire performance of the existing roof... |
|
Energy and AtmosphereLEED v5 O&M Existing Buildings Public Commentsposted by Birgitte Messerschmidt on May 7, 2024, 2:18 pm
Add that if installing Battery Energy Storage systems this should be done in accordance with NFPA 855. |
|
Interiors Life-Cycle Impact Reduction- Option 3 Design for FlexibilityCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Laura Riegle on Jul 13, 2022, 9:26 am
Hi, I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project. In the project, there are concrete floors (no systems to... Last reply: Brightworks Sustainability, May 7, 2024, 9:27 pm |
|
Lack of Bicycle Network FacilityCS-v4 LTc6: Bicycle facilitiesposted by Junaid Khan on Aug 8, 2018, 1:41 am
Hi Our firm is currently working on a core & shell project of an office building. We've designed a bicycle facility in accordance with the LEED credit compliance, within the building... Last reply: Brightworks Sustainability, May 7, 2024, 11:53 pm |
|
Residential High-Rise: BD+C New Construction vs. LEED HomesLEED Rating System Selectionposted by Vitor Leite Goncalves on Jun 30, 2023, 12:56 pm
Hello all, The project is a 6-story residential building located in the United States. USGBC website says that... Last reply: Andrey Kuznetsov, May 8, 2024, 4:03 am |
|
BD+C: Multifamily Midrise or New Construction?LEED Rating System Selectionposted by Victoria Rios Esteve on Sep 20, 2021, 6:08 pm
Hi everyone! We have some doubt on which would be the most suitable rating system for a project. It is a 9-stories residential building. So, we believe it can be either BD+C: Multifamily... Last reply: Andrey Kuznetsov, May 8, 2024, 4:12 am |
|
New Requirement? CDPH Emissions Testing Under Certain Conditions?NC-v4.1 EQc2: Low-emitting materialsposted by Brian Salazar on May 8, 2024, 9:46 am
I have recently had LEED review for LEM kicked back because the Greenguard Gold or other material certificates were presumed under CDPH v1.2 for Classroom environment vs Office environment. I... Last reply: Emily Purcell, May 8, 2024, 10:39 am |
|
LEED certification for advanced construction processLEED Rating System Selectionposted by Glenn Roosen on Mar 26, 2024, 8:40 am
Good afternoon, I have a question regarding a project that is in the end phase of the construction works (final delivery of the building in September 2024), and they would like to see if a... Last reply: Kath Williams, May 8, 2024, 10:41 am |
|
run off volume calculation methodology- help neededCS-v4.1 SSc4: Rainwater managementposted by Konstantina Kalliakoudi on Jan 20, 2023, 10:20 am
Hello to all Leed users, I am new at this credit. I have a project in which I want to implement Option 1. I have understood how the 90th percentile and the runoff site are... Last reply: Samuel Calhoun, May 8, 2024, 4:45 pm |
|
Can ID+C be selected for whole building?LEED Rating System Selectionposted by Leo LeQuoc on Jan 29, 2024, 11:20 pm
Our team is working on a project of a whole 2-storey (to be) newly constructed office building. I wonder (1) whether we can apply both floors to ID+C rating system or it has to be a single... Last reply: Andrey Kuznetsov, May 8, 2024, 5:08 pm |