office building with large factory

LEED Rating System Selection
posted by  Emmanuel Pauwels  on 

Our client has a large factory which is under construction. He now wants to add office space and will add an office building to the project. He wants the office building to be LEED certified.

3
Tue Nov 13, 2012, 5:29 pm

A central atrium

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Biagio Arevalo  on 

I’m planning to approach this credit through the prescriptive path. My building has windows on all four facades. It also has a central atrium that measures 49.20ft x 49.20ft (2.420sf).

2
Tue Nov 13, 2012, 3:51 pm

Lighting density in Shopping Centre mall areas

CS-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

According to ASHRAE 90.1, power allowance for lighting in mall areas is 18 W/m2 (table 9.6.1).

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Nov 13, 2012, 3:31 pm

gross lighted floor area and no changes to ligting installation

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Adam Targowski  on 

1. I would like to confirm one thing regarding Lighting Power Density Reduction calculations. What is Gross Lighted Floor area that should be used in Building Area Method calculations?

3
Tue Nov 13, 2012, 1:25 pm

No non-incandescent replacement for Purchasing Plan

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Elizabeth Crenshaw Hammitt   on 

We have over 6,000 lamps in our building, and all but 26 have readily available low-mercury/ high efficiency counter parts. The 26 in question are "mini candelabras" ....

3
Mon Nov 12, 2012, 9:28 pm

Tracking in Residence Halls

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  American University  on 

We're working on a LEED Volume prototype for our campus and received this feedback on MRc4: Only up to 10% of the floor area under separate control may be excluded from the calculations, so if resi

3
Mon Nov 12, 2012, 9:15 pm

How does this people still using the title LEED AP

General forums
posted by  Zachary Rohlfs  on 

How is this relevant to the fact that people may still use the title LEED AP without needing CEU hours or keeping themselves up to date on current building practices?

10
Default Avatar
Plumbing and Fire Protection Engineer
LEEDuser Basic Member
1 thumbs up
Mon Nov 12, 2012, 8:32 pm

Just in Time!

General forums
posted by  Marcus Sheffer  on 

My date is in December and I have procrastinated doing anything. Sounds like I may be glad I waited. I would also put in a plug for waiving the CMP entirely for LEED Fellows!

7
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Nov 12, 2012, 7:06 pm

What Constitutes a Flooring System?

Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Grace Heicher  on 

This may seem like a simple question, but do recessed foot grilles or walk-off matts count as a flooring system?

3
Mon Nov 12, 2012, 4:09 pm

TSS RETENTION

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Albert Sagrera  on 

Hello! We are having a hard time justifying the 80% retention of TSS.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Nov 12, 2012, 11:27 am