Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

proposed case model - if design is not completed or CS project

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

proposed case model - if design is not completed or CS project I need some closure.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Nov 21, 2012, 3:34 pm

Feedback Survey

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Melissa Wackerle  on 

Where can I get a copy of the feedback survey? The link above is broken. Thanks in advance.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 21, 2012, 3:32 pm

Principal Project Building Activity Definitions

NC-2009 PIf3:Occupant and Usage Data
posted by  RETIRED   on 

I am trying to locate a document or more information from USGBC regarding the Principal Project Building Activities.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Nov 21, 2012, 3:27 pm

SSp2

Schools-2009 SSp2:Environmental Site Assessment
posted by  Mike Walker  on 

Can a Phase I be eliminated by moving directly to a Phase II assessment?

5
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Nov 20, 2012, 9:17 pm
9
Tue Nov 20, 2012, 7:05 pm

ASHRAE Standard 90.1 Table G3.2 and occupancy sensors

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Alex AC  on 

Hi everybody, My team and I are working on a CI project (office floor) where the tenant has installed occupancy sensors for up to 75% of connected lighting load.

3
Default Avatar
LEEDuser Basic Member
5 thumbs up
Tue Nov 20, 2012, 3:20 pm

Doubt about climatic zone outside US

CS-2009 EAp2:Minimum Energy Performance
posted by  Elodie DUMAS  on 

Hi all We work on a office project at Marseille France with the Leed CS 2009 ; According to - Table B-3 International Climate Zones Ashrae 90.1 2007 : Marseille / France is located in zone 4 - § B

3
Default Avatar
ALTO Ingénierie
LEEDuser Basic Member
15 thumbs up
Tue Nov 20, 2012, 3:15 pm

Total daily occupancy, adjusting peak number in table Plf3-3

NC-2009 PIf3:Occupant and Usage Data
posted by  Tom O'Neil  on 

My project has completed the initial review and I now realize that the peak transient occupancy number I listed in table Plf3-3 is incorrect.

6
Default Avatar
architect
O'Neil Architects, Inc.
LEEDuser Basic Member
1 thumbs up
Tue Nov 20, 2012, 3:12 pm

New Table 1.4 Spreadsheet SI-Units

NC-2009 EAp2:Minimum Energy Performance
posted by  Johannes Hopf  on 

Dear all, we gladly noticed that the Table 1.4 spreadsheet improved a lot. Now it is more like a interactive toolkit. Unfortunately most of the items are just in IP-Units available.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Nov 20, 2012, 2:45 pm

Boilers minimum efficiency ASHRAE 90.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

Can anynone clarify if boilers minimum efficiency requirements set in table 6.8.1 F is based on fuel higher heating value (HHV) or lower heating value (LHV)?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 19, 2012, 8:30 pm