Forum quick links
FSC assembly requirement for LEED
NC-2009 MRc7:Certified Woodposted by Paul Setzer on
Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.
summary for mechanically ventilated spaces
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by BH . on
So briefly (for C&S mechanically ventilated spaces): For densly occupied spaces we need: CO2 monitors and i.e.
Process energy
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
I got the reviewed comment on the process energy. The way I have modelled is try to add the process load to reach 25% minumum energy threshold eventhough such load does not exist.
Assessing the new MR credits - MRC4 - material ingredients
posted by Tom Lent on
This credit signifies a huge step in a positive direction for the building industry.
Cooling Fuels
CI-2009 EAc3:Measurement and Verificationposted by Nandana Kumar on
Hi, We need a clarification about the cooling fuels. What are cooling fuels referred to? Thank you Nandana
VAV Fume Hood Velocity in Proposed vs. Baseline Case
NC-2009 EAp2:Minimum Energy Performanceposted by Ralph Bicknese on
We have a University Science Building that will house research and teaching labs with multiple VAV fume hoods in several spaces.
Rainwater management
posted by Pamela Lippe on
Can anyone tell me how LEED is defining "in a manner best replicating natural site hydrology processes using low impact development and green infrastructure?" In an earlier version it was defined
i got a 100% on your test!
posted by brendan owens on
good stuff tristan - thanks for making this more fun!
Will the current materials approach hurt LEED?
posted by Rob Watson on
My short answer is “Yes, the current approach to the materials credits is hurting LEED.” Now that I’ve got people’s blood up, let me explain. The changes from the fourth to fifth comment draft of
Difference between this credit and prereq
ND-v2009 SLLc7:Site design for habitat or wetland and water body conservationposted by Lee Ann Walling, LEED AP ND on
Hi Eliot, I took your LEED-ND class in San Francisco.