Topic | Recent |
---|---|
MERV 8 filtrationNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Franklin Snyder on Aug 26, 2010, 9:22 am
I have a project that a contractor assumed that 2-layers of... Last reply: Allison Beer McKenzie, Aug 30, 2010, 2:23 pm |
|
Vacation/Sick DaysEBOM-2009 SSc4: Alternative Commuting Transportationposted by Andy Rhoades on Aug 30, 2010, 9:57 am
We have conducted an option 3, approach 2 (sample survey) for our project. The reference guide notes that if an occupant reports being absent due to vacation or a sick day, that it should... Last reply: Dan Ackerstein, Aug 30, 2010, 2:18 pm |
|
Shared Parking AreaNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Laurie Hammack on Aug 26, 2010, 7:43 pm
We are working on a project that shares a parking lot with a previous LEED certified project. The City is including that parking area in the required parking count for our project while raising... Last reply: Lauren Sparandara, Aug 30, 2010, 2:13 pm |
|
Dealing with MPR #6 if there is no meterGeneral forumsposted by Cara Mae Cirignano on Aug 30, 2010, 1:16 pm
In the MPR Supplemental Guidance ( http://www.usgbc.org/ShowFile.aspx?DocumentID=6473 ) we state: |
|
Lab WastesEBOM-2009 MRc8: Solid waste management - durable goodsposted by Jonathan Weiss on Aug 27, 2010, 3:24 pm
Is there any specific language anyone has found about contaminated waste? There are some clients who dispose of durable goods - laboratory refrigerators, other equipment - that cannot be... Last reply: Dan Ackerstein, Aug 30, 2010, 12:45 pm |
|
Maintenance PaintEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Lee Burns on Aug 18, 2010, 6:49 pm
I've been asked to document our mainenance paint purchases as GS-11. I can't seem to figure out where as I'm not convinced these are "ongoing consumables". We are not pursuing MR C1 anyway due to... Last reply: Jason Franken, Aug 30, 2010, 10:57 am |
|
ACEEE Updated LE/FE Green Score DocumentEBOM-2009 SSc4: Alternative Commuting Transportationposted by Andy Rhoades on Aug 30, 2010, 10:10 am
The link to the excel spreadsheet for LE/FE vehicles as defined by ACEEE is dated. Here is the 2010 link: http://www.greenercars.... |
|
Purchased wind energyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Chris Nixon on Aug 27, 2010, 3:40 pm
I have a client who has purchased all of his electricity from the Texas Wind Energy farm. Being wind energy, the source energy is almost the same as the site energy. However, since it's not... Last reply: Chris Nixon, Aug 30, 2010, 8:06 am |
|
Glare control in CS projectsCS-2009 IEQc8.1: Daylight and views - daylightposted by Jana Schulz on Aug 24, 2010, 6:41 pm
Wwe are working on several CS projects that have good daylight illumination levels. Nevertheless, there are some spaces that go over the 500... Last reply: Eddy Santosa, Aug 29, 2010, 11:21 pm |
|
where to upload scanned certificateEBOM-2009 IOc2: LEED Accredited Professionalposted by Rachael McClain on May 24, 2010, 6:57 pm
The IOc2 form has no place to upload a scanned copy of the certificate do you happen to know where you would upload the scanned copy of the certificate? Last reply: Tristan Roberts, Aug 29, 2010, 11:13 pm |