NC-2009 EAp2:Minimum Energy Performanceposted by Ivy Chen on
We would like to find out what have been included in item "Other Clg Accessories" under Primary Cooling in Energy Consumption Summary. In our baseline, Package Terminal Heat Pump is adopted.
MPDp1c and NPDc1j - sidewalk definition
posted by Tyler Baker on
Hello, I have a question about how sidewalk is defined. We have a sidewalk along the street edge of a park, and the park has a playground in it.
9.4.1.1 mandatories for CS
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
Hi everyone! If the project base building scope does not include the lighting fixtures for tenant spaces but wiring stub-outs are, do we still need to have the automatic control device for the "bu
Water Use Threshold for Credit Eligibility
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Adam Shelly on
There should be some sort of water use threshold that the project needs to exceed in order to be eligible for the credit.
FSC Mixed vs FSC Recycle on Invoices?
NC-2009 MRc7:Certified Woodposted by John Casciato on
If my invoice says FSC Mixed for an MDF order, even tough MDF is a recycle product by design, would that go towards MRc4 instead of MRc7 even if the invoice says FSC Mixed?
LEED for Healthcare on LEEDuser
posted by Tristan Roberts on
Greetings LEED-HC users! LEEDuser is now displaying the credit language for the entire LEED for Healthcare rating sytem on LEEDuser, with forums tied to individual credits.
Does 62MZ calculations needed?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dorilee Torres on
I am working with a facility to determine if they can meet the prerequisite for the LEED EBOM. Currently the facility has 12 AHU's, some of them working for the same single space.
FSC assembly requirement for LEED
NC-2009 MRc7:Certified Woodposted by Paul Setzer on
Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.
summary for mechanically ventilated spaces
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by BH . on
So briefly (for C&S mechanically ventilated spaces): For densly occupied spaces we need: CO2 monitors and i.e.
Process energy
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
I got the reviewed comment on the process energy. The way I have modelled is try to add the process load to reach 25% minumum energy threshold eventhough such load does not exist.